My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Reservoir 3 Structural Improvements PDB Project <br /> Progressive Design-Build Contract I Exhibit B.Owner's Project Criteria <br /> Criterion Requirement <br /> Reservoir Liner 1. The existing liner is under Warranty, and all repairs for damage to the liner <br /> Repairs occurring during field investigations or construction (if necessary) are the <br /> Design-Builder's responsibility and must be conducted by Layfield, the liner <br /> installer. <br /> Table 2 Reservoir 3 Construction Criteria <br /> Criterion Requirement <br /> General <br /> Site Access 1. The Reservoir 3 site is a fenced, gated utility site with controlled access. The <br /> Design-Builder will be provided access via gates from Evergreen Way and <br /> Highway Place, and shall maintain the general security of the site and keep <br /> gates closed and locked when not in active use. <br /> 2. The perimeter of Reservoir 3 can generally be accessed by a perimeter road <br /> around the reservoir. The perimeter road varies in elevation relative to the <br /> reservoir cover, being located upslope of the reservoir in some areas and <br /> downslope in other areas. The Design-Builder shall conduct site activities to <br /> safely accommodate for that slope, where it occurs. <br /> 3. There are other City of Everett and Alderwood Water District buildings and <br /> facilities within the fence line of the Reservoir 3 site. These buildings and <br /> facilities and access to them shall not be impaired by the Design-Builder's work. <br /> 4. There may be one or more contractors besides the Design-Builder active within <br /> the Reservoir 3 site during construction of the Project, working on other areas <br /> or facilities within the fence line. The Design-Builder shall avoid impeding the <br /> access or work of any other contractors working in other areas of the site. <br /> Page 7 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.