Laserfiche WebLink
City of Everett,Washington I Reservoir 3 Structural Improvements PDB Project <br /> Draft Progressive Design-Build Contract I Draft Exhibit D.Work included in Construction General Conditions <br /> — Fall protection <br /> — Safety program administration and training <br /> — Drug testing <br /> — Safety signage <br /> • Project Documentation <br /> — Photographs to document pre-field investigation and pre-construction conditions <br /> — Project progress photos <br /> — Reference manuals <br /> — Project redline drawings <br /> Page 4 of 4 <br />