My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Reservoir 3 Structural Improvements PDB Project <br /> Draft Progressive Design-Build Contract I Draft Exhibit D.Work included in Construction General Conditions <br /> owned by workers and required for the performance of the Work <br /> — Fuel for support work that does not directly result in the completion of physical Work <br /> associated with the completion of Phase 2. See also Section 7.5.1.8 of the Contract. <br /> — Surveying equipment and supplies, not including services of land surveying <br /> subcontractors <br /> — Project specific signage <br /> • Temporary Amenities and Utilities (includes hookup, metering, and consumption costs <br /> for temp offices) See also Section 7.5.7.8 of the Contract. <br /> — Drinking water (construction team personnel consumption) <br /> — Temporary toilets <br /> — Temporary water distribution (the City will provide all utility water for construction, <br /> including tank cleaning and filling, except as described in the PDB Contract <br /> regarding a tank refill after a failed liner integrity test) <br /> — Temporary fire protection <br /> — Temporary power drop and distribution systems. <br /> — Temporary and site emergency lighting <br /> — Temporary heat and ventilation except as required in direct association with the <br /> Performance of the Physical Work <br /> — Temporary weather protection except as required in direct association with the <br /> Performance of the Physical Work <br /> • Site Maintenance and Site Cleanup <br /> — Site security as elected by the contractor for his benefit <br /> — Site erosion control <br /> — Daily site cleanup, dumpsters, and garbage/recyclables disposal except for costs of <br /> construction debris and construction waste removal associated with the Performance <br /> of the Physical Work <br /> — Cleanup at Substantial Completion <br /> • Health and Safety <br /> — Personal protective equipment (PPE)for staff and visitors <br /> — COVID-19 related PPE (e.g., face masks, face shields, etc.) and all other COVID-19 <br /> related safety implementation measures (e.g., temperature check stations) <br /> — Confined space entry, including personnel protective and monitoring equipment, <br /> standby personnel, and all related costs <br /> — Handwashing stations, hand soap, and handwashing signage <br /> — Alcohol-based hand sanitizer <br /> — First aid <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.