My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
James W. Fowler Co. 12/1/2021
>
Contracts
>
Capital Contract
>
James W. Fowler Co. 12/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:19:48 AM
Creation date
12/10/2021 10:17:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
James W. Fowler Co.
Approval Date
12/1/2021
Council Approval Date
11/17/2021
Department
Public Works
Department Project Manager
John Nottingham/Souheil Nasr
Subject / Project Title
Reservoir #3 Structural Improvements
Public Works WO Number
UT3739
Tracking Number
0003108
Total Compensation
$753,079.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Reservoir 3 Structural Improvements PDB Project <br /> Request for Proposals I Attachment 1. Required Forms <br /> FORM 7. PHASE 1 ALL-INCLUSIVE BILLING RATES <br /> Form 7 shall be completed by each firm that will provide Phase 1 services. This form <br /> (Phase 1 All-Inclusive Billing Rates) will be incorporated into Exhibit E (Supporting <br /> Pricing Information) of the Design-Build Contract. <br /> [Firm Name] Phase 1. All-Inclusive Billing Rates <br /> All-Inclusive <br /> Key Firm Labor Category Billing Rate <br /> James W Fowler Co. Project Executive $ 260.00 <br /> James W Fowler Co. Design Build Manager $ 240.00 <br /> James W Fowler Co. Construction Manager $ 180.00 <br /> James W Fowler Co. Project engineer $ 135.00 <br /> James W Fowler Co. Estimator $ 180.00 <br /> Kennedy Jenks Design Manager $ 217.00 <br /> Kennedy Jenks QA/QC Technical Advisor $ 267.00 <br /> Kennedy Jenks Site/Civil Engineer $ 159.00 <br /> Kennedy Jenks Technical Advisor $ 274.00 <br /> Kennedy Jenks Structural Engineer $ 240.00 <br /> Kennedy Jenks Engineer $ 141.00 <br /> Kennedy Jenks CAD Design $ 165.00 <br /> Kennedy Jenks Project Administration $ 122.00 <br /> Notes <br /> 1. Phase 1 Services shall be billed at the all-inclusive billing rates and labor categories <br /> identified above, and these rates shall not be subject to increase for any Phase 1 services. <br /> 2. The Phase 1 Services compensation is deemed to include all sales, use, consumer, and <br /> other taxes mandated by applicable Legal Requirements. <br /> 3. Provide billing rates for personnel who will provide services during Phase 1, including Key <br /> Personnel and others. The Proposer shall commit to the use of listed billing rates for all <br /> services provided for the duration of Phase 1. <br /> 4. Additional staff subsequently proposed to be added by the Design-Builder during Phase 1 <br /> must be approved by the City and will be assigned a billing rate consistent with equivalent <br /> staff listed in the PDB Contract. <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.