Laserfiche WebLink
• <br /> r <br /> CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> June 16, 2021 <br /> Mr. Paul Pikalov <br /> StroyCo <br /> 2627 S 349th Street <br /> Federal Way, WA 98003 <br /> JUL 1 6 2021 1.) <br /> Email Address: paulpikalov@yahoo.com CITY OF EVERETT <br /> RE: Owner: Ami Straight Permit Services <br /> Job Address: 1401 Rainier Avenue <br /> Plan Check Number: B2106-003, First Building Review <br /> Dear Mr. Pikalov, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments address building issues only. <br /> Additional revisions or additions may be required by other departments including Public Works, <br /> Planning, and Fire. <br /> Code citations provided in the following comments reference the Everett Municipal Code (EMC), <br /> 2018 International Residential Code (IRC), and the residential provisions of the 2018 Washington <br /> State Energy Code (WSEC). Amendments to the building codes by the Washington Administrative <br /> Code (WAC) are identified. Citations provided in the comments reference the IRC unless noted <br /> otherwise. Web-based versions of these documents can be viewed the following web addressed: <br /> • EMC: htt s: wwvv.code ublishin .com W Everett <br /> • 2018 IRC: https://codes,iccsafe.orcijcontent/IRC2015 <br /> • 2018 WSEC: http://www.enerdy,WSLI.edu/BuildingEfficiency/EnergyCode.aspx <br /> • WAC: https://qgps.led.wa.gov/wacidefauit.aso?cite--51 <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to Permit Services for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations (if applicable). <br /> Submittal documents should contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted building codes. Upon submittal of the revised documents, your <br /> application will be given priority and the review will recommence. <br /> FG:71 of <br />