Laserfiche WebLink
�a <br />A <br />PROJECT �t <br />NORTH <br />(DEMOLITION LEGEND APPLIES TO ALL DEMOLITION DRAWINGS) <br />(DEMOLITION GENERAL NOTES APPLY TO ALL DEMOLITION DRAWINGS) <br />EXISTING TO REMAIN <br />THE DRAWINGS & SPECIFICATIONS DELINEATE THE BASIC SCOPE OF WORK FOR THE REMOVAL OF EXISTING MATERIALS. THESE <br />DRAWINGS HAVE BEEN DEVELOPED FROM OWNER PROVIDED AS-BUILTS AND MAY VARY FROM ACTUAL FIELD CONDITIONS. THE <br />DEMOLITION DRAWINGS AND NOTES ARE PROVIDED WITH THE INTENT TO GENERALLY DESCRIBE AREA AND LIMITS OF WORK. THE <br />EXISTING TO BE DEMOLISHED <br />CONTRACTOR SHALL BE FAMILIAR WITH THE SITE AND CONDITIONS THEREON. ALL BIDDERS ARE ENCOURAGED TO PERFORM A <br />SITE INSPECTION PRIOR TO BIDDING. <br />I, <br />AREA OF NO ARCHITECTURAL WORK U.N.O. <br />1. "REMOVE" "DEMO", OR "DEMOLISH" SHALL DENOTE ITEMS TO BE REMOVED FROM THE SITE AND PROPERLY DISPOSED <br />OF, UNLESS ITEM IS NOTED TO BE SALVAGED FOR THE OWNER'S FUTURE USE OR TO BE REINSTALLED AS NEW WORK. <br />jk <br />RACTOR S BASE BlD. <br />ALL COSTS FOR REMOVAL AND DISPOSAL OF DEMOLISHED ITEMS SHALL BE INCLUDED IN CONT° <br />.-._�. < <br />2. CONTRACTOR SHALL PROVIDE PROTECTION OF MATERIALS, EQUIPMENT AND FINISHES WHICH ARE TO REMAIN OR <br />NOTED TO BE SALVAGED AND/OR RE -USED. CONTRACTOR SHALL BE RESPONSIBLE FOR SECURELY STORING ALL ITEMS <br />IDENTIFIED TO BE REMOVED, SALVAGED AND REINSTALLED. DAMAGES SHALL BE REPAIRED OR REPLACED AT NO <br />ADDITIONAL COST TO OWNER. <br />1 <br />EXISTING CONDITION PHOTOGRAPH TAG, SEE DEMO <br />PLAN FOR LOCATIONS AND AD2.11 FOR PHOTOGRAPH <br />3. CONTRACTOR SHALL DEMOLISH AND/OR CAP ALL UTILITIES CONNECTED TO EQUIPMENT IDENTIFIED TO BE DEMOLISHED <br />OR SALVAGED SUCH THAT THE UTILITY WILL NOT INTERFERE WITH THE RENOVATION/ADDITION WORK UNDER THIS <br />2.2 <br />PROJECT <br />NORTH <br />ORIGINAL SHEET IS 30" x 42" <br />copyrLght 2020 <br />all rights reserved <br />Q <br />2.E <br />CONTRACT: COORDINATE WITH MECHANICAL/ELECTRICAL DRAWINGS. <br />4. CONTRACTOR TO BE RESPONSIBLE FOR CUTTING AND PATCHING OF FINISHES AS REQUIRED TO ACCOMMODATE <br />CONSTRUCTION, INCLUDING ALL STRUCTURAL, MECHANICAL AND ELECTRICAL DEMOLITION WORK. <br />5. STABILITY OF THE STRUCTURE DURING CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR. ALL TEMPORARY <br />SHORING AND SUPPORT IS PART OF THIS CONTRACT. <br />6. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION CALLOUTS. <br />7. OWNER HAS FIRST RIGHT TO SALVAGE ANY ITEMS PRIOR TO DEMOLITION. EXISTING CURTAINS, RAILS, AND WELDING <br />EQUIPMENT TO BE SALVAGED. BELT SANDERS AND CNC TABLE TO BE SALVAGED. <br />2.0 <br />2.® 2. <br />2. <br />I <br />architect <br />MCGRANAHAN ARCHITECTS <br />mechanical enIneer <br />SCE ENGINEERS <br />electrical engineer <br />BCE ENGINEERS <br />90 REGISTERED <br />ARCHITECT <br />ANDREW M H TUNG <br />STATE OF WASHINGTON <br />Project_ <br />SNO-ISLE TECH SKILLS CENTER <br />WELDING SHOP REMODEL <br />cIIent <br />MUKILTEO SCHOOL DISTRICT NO.6 <br />location <br />EVERET7', WA <br />drawn_ <br />H FB <br />checked_ <br />AH <br />