<br />15. LOCATIONS OF RACEWAY, PATHWAY AND SIMILAR ITEMS ARE
<br />SHOWN SCHEMATICALLY. COORDINATE INSTALLATION,
<br />INCLUDING BUT NOT LIMITED TO CABLING,
<br />TELECOMMUNICATION PATHWAYS AND SPACES, AND EXACT
<br />LOCATION OF HORIZONTAL AND BACKBONE CABLING WITH
<br />LOCATIONS OF FIXED CASEWORK AND BUILDING CONDITIONS
<br />AFFECTING THE WORK OF THIS CONTRACT.
<br />I& COORDINATE TELECOMMUNICATIONS WORK WITH THAT OF
<br />OTHER TRADES. REFER TO ELECTRICAL, MECHANICAL,
<br />ARCHITECTURAL, STRUCTURAL, CIVIL, AND LANDSCAPE
<br />DRAWINGS AND SPECIFICATIONS. COORDINATION SHALL
<br />OCCUR PRIOR TO FABRICATION, PURCHASE, AND
<br />INSTALLATION OF WORK.
<br />17. NEW CABLING INSTALLATIONS SHALL BE CONCEALED IN
<br />WALL, CEILINGS, AND BELOW RAISED FLOOR SPACES
<br />UNLESS OTHERWISE NOTED ON THE DRAWINGS. CABLING IN
<br />ACCESSIBLE CEILING SPACES SHALL BE INSTALLED AS OPEN
<br />CABLING NEAR STRUCTURES AND WALLS OR AS
<br />SPECIFICALLY NOTED ON DRAWINGS. SEE SPECIFICATIONS
<br />FOR SUPPORT REQUIREMENTS.
<br />18. PROVIDE FIRESTOPPING SYSTEMS FOR CONDUIT AND
<br />RACEWAY SYSTEMS AT PENETRATIONS, SLEEVES AND
<br />SLOTS OF FIRE RATED CONSTRUCTION FOR HORIZONTAL
<br />AND INTRABUILDING PATHWAYS AND SPACES.
<br />19. INTRABUILDING OPTICAL FIBER CABLING SHALL BE CLEARLY
<br />AND VISIBLY IDENTIFIED IN PULLBOXES, ENTRANCE POINTS,
<br />EACH RISER ROOM, AND 5°-0" BEFORE ENTERING A FREE
<br />STANDING RACK UTILIZING AN OPTICAL FIBER CABLE MARKER
<br />TAG SYSTEM.
<br />20. MAINTAIN A MINIMUM SPACING OF 12" FROM ELECTRICAL
<br />FEEDERS AND BRANCH CIRCUIT WIRING AND 12" FROM
<br />AUXILIARY SYSTEM CABLING.
<br />21. MINIMUM SPACING FROM ELECTRICAL APPARATUS SUCH AS
<br />MOTOR DRIVEN EQUIPMENT AND TRANSFORMERS SHALL BE
<br />6°-0". SPACING REQUIREMENTS SHALL APPLY TO OPEN
<br />CABLING PATHWAYS WHERE EQUIPMENT IS LOCATED ON
<br />THE SAME FLOOR, FLOOR ABOVE, FLOOR BELOW, OR IN
<br />ROOMS ADJACENT TO SUCH EQUIPMENT AS THOUGH WALLS
<br />AND FLOORS DID NOT EXIST. EXCEPTION: BUILDING
<br />CONSTRUCTION THAT RESULTS IN CONTINUOUS METALLIC
<br />BARRIER BETWEEN ELECTRICAL APPARATUS AND CABLE
<br />PATHWAYS SHALL BE CONSIDERED AS SUITABLE
<br />SEPARATION.
<br />22. PRIOR TO STARTING TELECOMMUNICATIONS INSTALLATION,
<br />CAREFULLY INSPECT INSTALLED WORK OF OTHER TRADES
<br />AND VERIFY THAT SUCH WORK IS COMPLETE TO THE POINT
<br />WHERE WORK MAY PROPERLY COMMENCE. NOTIFY THE
<br />ARCHITECT AND ENGINEER IN WRITING OF CONDITIONS
<br />DETRIMENTAL TO THE PROPER AND TIMELY COMPLETION OF
<br />THE WORK.
<br />23. DO NOT BEGIN TELECOMMUNICATIONS INSTALLATION UNTIL
<br />ALL UNSATISFACTORY CONDITIONS ARE RESOLVED.
<br />BEGINNING WORK CONSTITUTES ACCEPTANCE OF
<br />CONDITIONS AS SATISFACTORY.
<br />24. ROUTE CATEGORY 5/6A CABLES TO THEIR ASSIGNED CROSS -
<br />CONNECT PER THE IDENTIFICATION LABEL AT EACH
<br />TELECOMMUNICATIONS WORKSTATION DEVICE. TERMINATE
<br />ALL CABLES ON 48-PORT PATCH PANELS ON RACKS UNLESS
<br />OTHERWISE NOTED.
<br />25. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL
<br />CONDUIT, OUTLET BOXES, JUNCTION BOXES, RACEWAY
<br />SYSTEMS, ETC. FOR A COMPLETE AND OPERATIONAL
<br />PATHWAY SYSTEM FOR ALL TELECOMMUNICATIONS
<br />SYSTEMS PER THE SCOPE OF WORK INDICATED ON THE
<br />CONSTRUCTION DRAWINGS AND BID SPECIFICATIONS.
<br />26. CABLE TRAY PATHWAYS ABOVE ACCESSIBLE CEILINGS SHALL
<br />BE PROVIDED BY THE ELECTRICAL CONTRACTOR. CABLE
<br />TRAY PATHWAYS BELOW RAISED FLOOR SPACES SHALL BE
<br />PROVIDED BY THE TELECOMMUNICATIONS CONTRACTOR.
<br />A AMPERE
<br />AC AIR CONDITIONING; ALTERNATING CURRENT,
<br />ABOVE COUNTER
<br />AF AMP FRAME
<br />AF AMP FUSE; AMP FRAME
<br />AFC AVAILABLE FAULT CURRENT
<br />AFF ABOVE FINISHED FLOOR
<br />AG ABOVE GRADE
<br />AHJ AUTHORITIES HAVING JURISDICTION
<br />AHU AIR HANDLING UNIT
<br />AIC AMPERE INTERRUPTING CAPACITY
<br />AL ALUMINUM
<br />ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
<br />AS AMP SWITCH
<br />AT AMP TRIP
<br />ATM AUTOMATIC TRANSFER SWITCH
<br />ATS ASYNCHRONOUS TRANSFER MODE
<br />AV AUDIO VISUAL
<br />AWG AMERICAN WIRE GAUGE
<br />BAS BUILDING AUTOMATION SYSTEM
<br />BATT BATTERIES
<br />BIL BACKBOARD
<br />BKBD BASIC IMPULSE INSULATION LEVEL
<br />BKR BREAKER
<br />BLDG BUILDING
<br />C CONDUIT; DEGREES CELCIUS
<br />CAB CABINET
<br />CAT CATEGORY
<br />CATV COMMUNITY ANTENNA TELEVISION
<br />CB CIRCUIT BREAKER
<br />CCTV CLOSED CIRCUIT TELEVISION
<br />CLG CEILING
<br />CM CEILING —MOUNTED
<br />CO CONDUIT ONLY
<br />CR CONTROLLED RECEPTACLE
<br />CT CURRENTTRANSFORMER
<br />CU COPPER
<br />D DEDICATED
<br />DDC DIRECT DIGITAL CONTROL
<br />DEMARC DEMARCATION POINT
<br />DISC DISCONNECT
<br />DIST DISTRIBUTION
<br />DSL DIGITAL SUBSCRIBER LINE
<br />DWG DRAWING
<br />(E) EXISTING
<br />EA EACH
<br />EF EXHAUSTFAN
<br />EIA ELECTRONIC INDUSTRIES ASSOCIATION
<br />ELEV ELEVATION
<br />EM EMERGENCY
<br />EMT ELECTRICAL METALLIC TUBING
<br />ENCL ENCLOSURE
<br />EPM ELECTRONIC POWER METER
<br />EPO EMERGENCY POWER OFF
<br />EQUIP EQUIPMENT
<br />ETR EXISTING TO REMAIN
<br />EWC ELECTRIC WATER COOLER
<br />F FUSES; DEGREES FAHRENHEIT
<br />FA FIRE ALARM
<br />FAAP FIRE ALARM ANNUNCIATOR PANEL
<br />FACP FIRE ALARM CONTROL PANEL
<br />FBO FURNISHED BY OWNER
<br />FOIC FURNISHED BY OWNER INSTALLED BY
<br />CONTRACTOR
<br />FOIO FURNISHED BY OWNER INSTALLED BY OWNER
<br />FSD FIRE SMOKE DAMPER
<br />G GROUND
<br />GF GROUND FAULT CIRCUIT INTERRUPTER
<br />GFP GROUND FAULT PROTECTION
<br />GND GROUND
<br />GRS GALVANIZED RIGID STEEL
<br />HC HORIZONTAL CROSS CONNECT
<br />HID HIGH INTENSITY DISCHARGE
<br />HP HORSEPOWER
<br />HTR HEATER
<br />Hz HERTZ
<br />IBC INTERMEDIATE CROSS CONNECT
<br />IC INTERNATIONAL BUILDING CODE
<br />IDF INTERMEDIATE DISTRIBUTION FRAME
<br />IEEE INSTITUTE OF ELECTRICAL AND ELECTRONIC
<br />ENGINEERS
<br />IG ISOLATED GROUND
<br />IMC INTERMEDIATE METALLIC CONDUIT
<br />ISDN INTEGRATED SERVICES DIGITAL NETWORK
<br />J JUNCTION
<br />KCMIL THOUSAND CIRCULAR MILS
<br />kVA KILOVOLT AMPERE
<br />KVAR KILOVOLT AMPERE REACTIVE
<br />kW KILOWATT
<br />LAN LOCAL AREA NETWORK
<br />LCP LIGHTING CONTROL PANEL
<br />LEC LOCAL EXCHANGE CARRIER
<br />LT LIGHT
<br />LTG LIGHTING
<br />M METER
<br />MAN METROPOLITAN AREA NETWORK
<br />MAX MAXIMUM
<br />MC MAIN CROSS CONNECT; METAL CLAD (CABLE)
<br />MCB MOTOR CONTROL CENTER
<br />MCC MAIN CIRCUIT BREAKER
<br />MDF MAIN DISTRIBUTION FRAME
<br />MDP MAIN DISTRIBUTION PANEL
<br />MFR MANUFACTURER
<br />MH MANHOLE
<br />MIN MINIMUM
<br />MLO MAIN LUGS ONLY
<br />MM MULTIMODE
<br />MPOE MAIN POINT OF ENTRY
<br />MPOP MAIN POINT OF PRESENCE
<br />MTD MOUNTED
<br />MTS MANUAL TRANSFER SWITCH
<br />(N) NEW
<br />N NEUTRAL
<br />NAC NOTIFICATION APPLIANCE CIRCUIT
<br />NEC NATIONAL ELECTRICAL CODE
<br />NEMA NATIONAL ELECTRICAL MANUFACTURERS
<br />ASSOCIATION
<br />NF NON —FUSED
<br />NIC NOT IN CONTRACT
<br />NL NIGHT LIGHT
<br />OFC OPTICAL FIBER CABLE
<br />OHL OVERHEAD LINE
<br />OL OVERLOAD
<br />OS OCCUPANCY SENSOR
<br />OSP OUTSIDE PLANT
<br />P POLE
<br />PBX PRIVATE BRANCH EXCHANGE
<br />PF POWER FACTOR
<br />PH PHASE
<br />PIR PASSIVE INFRARED
<br />PIV POST INDICATING VALVE
<br />PNL PANEL
<br />PP PATCH
<br />PT POTENTIAL TRANSFORMER
<br />PVC POLYVINYL CHLORIDE
<br />RCP REFLECTED CEILING PLAN
<br />REC RECEPTACLE
<br />REF REFER TO
<br />REV REVISION
<br />RM ROOM
<br />RTRC REINFORCED THERMOSETTING RESIN CONDUIT
<br />RU RACK UNIT
<br />SHT SHEET
<br />SLC SIGNALING LINE CIRCUIT
<br />SM SINGLEMODE
<br />SMFC SURFACE —MOUNTED OPTICAL FIBER CABINET
<br />SMR SURFACE METAL RACEWAY
<br />SONET SYNCHRONOUS OPTICAL NETWORK
<br />SP SERVICE PROVIDER
<br />SPD SURGE PROTECTIVE DEVICE
<br />SPEC SPECIFICATIONS
<br />SPST SINGLE POLE SINGLE THROW
<br />ST SHUNT TRIP
<br />STP SHIELDED TWISTED PAIR
<br />SVGA SUPER VIDEO GRAPHICS ARRAY
<br />SW SWITCH
<br />SWBD SWITCHBOARD
<br />TBB TELECOMMUNICATIONS BONDING BACKBONE
<br />TEL TELEPHONE
<br />TELCO TELEPHONE COMPANY
<br />TGB TELECOMMUNICATIONS GROUNDING BUSBAR
<br />TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION
<br />TMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBAR
<br />TP TAMPERPROOF
<br />TR TELECOMMUNICATIONS ROOM
<br />TTB TELEPHONE TERMINAL BOARD
<br />TV TELEVISION
<br />TVSS TRANSIENT VOLTAGE SURGE SUPPRESSION
<br />TYP TYPICAL
<br />UG UNDERGROUND
<br />UL UNDERWRITERS LABORATORIES
<br />UON UNLESS OTHERWISE NOTED
<br />UPS UNINTERRUPTIBLE POWER SUPPLY
<br />USB UNIVERSAL SERIAL BUS
<br />UTP UNSHIELDED TWISTED PAIR
<br />UV UNIT VENTILATOR
<br />V VOLTS
<br />VA VOLT AMPERES
<br />VFD VARIABLE FREQUENCY DRIVE
<br />W WASTE, WATT, WIDE, WATER
<br />W/ WITH
<br />W/O WITHOUT
<br />WA WORKSTATION AREA
<br />WAN WIDE AREA NETWORK
<br />WG WIRE GUARD
<br />WH WATT HOUR METER
<br />WP WEATHERPROOF
<br />XMFR TRANSFORMER
<br />Y WYE
<br />Z IMPEDANCE
<br />.�MOM— "IM410 I.aal"tul„.1 , � I
<br />1. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE
<br />2015 INTERNATIONAL BUILDING CODE AND FROM THE
<br />AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) STANDARD
<br />7. THE CONTRACTOR SHALL REFER TO THE ABOVE FOR
<br />ADDITIONAL INFORMATION, EXCEPTIONS, AND FURTHER
<br />DESCRIPTIONS. THE CONTRACTOR SHALL ADHERE TO
<br />REQUIREMENTS AND AS SUCH, SHALL BE INCLUDED WITHIN
<br />BID. ALSO REFER TO SPECIFICATIONS.
<br />2. 2015 IBC 1613.1 SCOPE: ARCHITECTURAL,
<br />C URAL MECHANICAL
<br />,
<br />ELECTRICAL AND NON-STRU
<br />CTURAL COMPONENTS THAT
<br />ARE PERMANENTLY ATTACHED TO STRUCTURES AND THEIR
<br />SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED AND
<br />CONSTRUCTED TO RESIST THE EFFECTS OF EARTHQUAKE
<br />MOTIONS IN ACCORDANCE WITH ASCE 7, EXCLUDING
<br />CHAPTER 14 AND APPENDIX 11A.
<br />3. ASCE 7 CONTRACTOR RESPONSIBILITY:
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
<br />CONSTRUCTION OF A SEISMIC -FORCE -RESISTING SYSTEM,
<br />DESIGNATED SEISMIC SYSTEM, OR COMPONENT LISTED IN
<br />THE QUALITY ASSURANCE PLAN SHALL SUBMIT A WRITTEN
<br />CONTRACTOR'S STATEMENT OF RESPONSIBILITY TO THE
<br />AUTHORITY HAVING JURISDICTION AND TO THE OWNER
<br />PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM
<br />OR COMPONENT. THE CONTRACTOR'S STATEMENT OF
<br />RESPONSIBILITY SHALL INCLUDE THE FOLLOWING:
<br />A. ACKNOWLEDGMENT OF AWARENESS OF THE
<br />SPECIAL REQUIREMENTS CONTAINED IN THE
<br />QUALITY ASSURANCE PLAN;
<br />B. ACKNOWLEDGMENT THAT CONTROL WILL BE
<br />EXERCISED TO OBTAIN CONFORMANCE WITH
<br />THE CONSTRUCTION DOCUMENTS APPROVED BY
<br />THE AUTHORITY HAVING JURISDICTION;
<br />C. PROCEDURES FOR EXERCISING CONTROL
<br />WITHIN THE CONTRACTOR'S ORGANIZATION,
<br />THE METHOD AND FREQUENCY OF
<br />REPORTING AND THE DISTRIBUTION OF THE
<br />REPORTS, AND
<br />D. IDENTIFICATION AND QUALIFICATIONS OF THE
<br />PERSON(S) EXERCISING SUCH CONTROL AND
<br />THEIR POSITION(S) IN THE ORGANIZATION.
<br />4. DIVISION 26 RESPONSIBILITIES:
<br />A. HANGERS, AND SEISMIC BRACING FOR
<br />ELECTRICAL SYSTEMS SHALL BE DESIGNED
<br />AND SPECIFIED BY DIVISION 26. DIVISION 26
<br />SHALL REFER TO THE ELECTRICAL
<br />DRAWINGS FOR LOCATIONS OF EQUIPMENT
<br />AND ELECTRICAL SYSTEMS AS STRUCTURAL
<br />DRAWINGS DO NOT SHOW THE LOCATIONS OF
<br />ELECTRICAL EQUIPMENT, RACEWAYS, AND
<br />OTHER COMPONENTS.
<br />B. DIVISION 26 SHALL COORDINATE THE
<br />SUPPORT SYSTEMS AND DESIGN LOADS FOR
<br />HUNG RACEWAYS AND OTHER ELECTRICAL
<br />SYSTEMS (INCLUDING COMBINED MULTIPLE
<br />RACEWAY RUNS) WITH THE GENERAL
<br />CONTRACTOR AND THE STEEL AND WOOD
<br />JOIST MANUFACTURERS IN ADDITION TO
<br />OTHER TRADES THAT MAY BE IMPACTED.
<br />ENERGY E NOTES
<br />RECORDDRAWINGS: SUBMIT O THE
<br />OWNER PER
<br />ENERGYCODE ENFORCED BY �
<br />MANUALS:2. OPERATION AND MAINTENANCE
<br />E BUILDING OWNER PER ENERGY CODE ENFORCED
<br />B�
<br />Y THE LOCAL AHJ.
<br />3. THIS BUILDING AND ITS ENERGY SYSTEMS HAVE BEEN
<br />DESIGNED O COMPLY WITH ENERGYOIII
<br />ENFORCED BY THE LOCALAHJ. CONTRACTIS
<br />OR
<br />RESPONSIBLE
<br />i!. -O- E. -CORRECT INSTALLATION OF
<br />ENERGY CONSERVATION MEASURES.
<br />t i.
<br />COMPLETION4. LIGHTING CONTROL SYSTEMS COMMISSIONING AND
<br />REQUIREMENTS: TEST SYSTEMS TO
<br />ENSURE THAT BUILDING SYSTEMS HAVE
<br />INSTALLED AND FUNCTIONPROPERLY D
<br />EFFICIENTLY, AND CAN BE MAINTAINED
<br />ACCORDANCE•'
<br />OPERATIONAL ENERGY
<br />ENFORCED BY THE AHJ. REFER TO SPECIFICATIONS
<br />FOR ADDITIONAL O •
<br />I
<br />"mg
<br />IBM
<br />.r� «k>u ..,:.. s..1 d,....°5--
<br />k' "'��r'S;':-e!�.�.4.x:k .'n�:.�
<br />(Hargis Engineers, Inc.
<br />1201 Third Avenue, Suite 600
<br />Seattle, WA 98101
<br />"
<br />F
<br />ABBREVIATIONS AND
<br />GENERAL
<br />i 4 4 � )$ NOTES
<br />d ,4 4
<br />I
<br />K
<br />3 1 4
<br />Q
<br />I
<br />is I'm
<br />
|