Laserfiche WebLink
v <br />N <br />M <br />30' EX. RIW <br />I\ <br />PI: 20+19.04 <br />i <br />0 <br />0 <br />OF RIMP,, <br />CIL OF RD <br />CITY EVRR d W1 Sa 5 tJ O.r <br />� � I <br />BOXLARGE <br />EC I <br />ROCK / <. / / \ \ \\\� Z /-1 �Z ��Z� <br />77 <br />ACCESS EASEMENT <br />PP <br />FOR SIDEWALK <br />•,,�„-,, - r ,gyp , �e u�.;:•,„:., -.,.� ,�.-�,� �.,�.� <br />/ / I EX. GARAGE I 1 <br />/ / I(MR) <br />CO APPROX. LOCATION / <br />OF SANITARY SEWER / P` C <br />L_ _STUB PER RECORD / I�i I I <br />- -- ------ I � INFORMATION ------ -- /-----------------iCO <br />-- J � <br />i ASPHALT DRIVE -- - -- -- - - � - -- � <br />R) <br />L / <br />S89°25'52'E 141.47 <br />/ 141.5,ZZ <br />n I ti <br />/ I <br />CONC. (TO REN) I <br />�(V w W W �W p W a W L- W I00 <br />ZE <br />�h A ROX.. LOCATION OF \� <br />\ / a 314" WATERLINE PER \V\/ \ \ (I a \) <br />/ R CORD INFORMATION \ / / CORNER OF EAVE YD-4 15 I <br />CONC. a / / / ®� / (TO RE N) I IM=1194.86 I <br />(TO REMAIN) / / / i PV, S IE=194.116 <br />4 ' PV� N IE=194. i 6 <br />\/ <br />EC. HOUSE <br />/ I a <br />ASPHALT DRIVE l / a o I r <br />a (T® RE N) / xl Y Off, / CONC. z 1 <br />/ r <br />4 p / <br />a <br />a <br />I <br />a <br />a B-421 1/ <br />RIM=194,38 1 �ro I <br />o \ / CONC. 4 " PVC Ih JL 193.73 <br />aO R 0) / _ 4" PVC E 1E=193. 68 <br />a ° <br />fr® �� vn-Q 3n <br />-75.00 <br />1--- I <br />IwM I <br />01 <br />I <br />i I <br />I I <br />I I <br />CB-325 I <br />RIM=196.13 <br />12" CONC N IE=194.18 <br />PP I <br />BM I <br />114 CORNER, SECTION 34-29-4 <br />FOUND CONCRETE MON IN CASE <br />WITH BRASS NAIL AND PUNCH <br />LOCATED IN SOUND AVE. <br />ELEV. = 242.70 <br />I 0 <br />ELEMENT #1 - MARK CLEARING LIMITS: <br />LIMIT OF CONSTRUCTION ARE CLEARLY MARKED. <br />ELEMENT #2 ESTABLISH CONSTRUCTION ACCESS: <br />A STABILIZED CONSTRUCTION ENTRANCE IS SHOWN. <br />REFER TO C.O.E. STD. DWG 201 <br />ELEMENT #3 - CONTROL FLOW RATES: <br />FLOWS ARE MINIMAL. <br />ELEMENT J4 - INSTALL SEDIMENT CONTROLS: <br />SILT FENCE (C.O.E. STD. DWG 214), INLET PROTECTION (C.O.E. STD. <br />DWG 210), MULCH ARE PROPOSED. <br />ELEMENT J5 - STABILIZE SOILS: <br />SOIL STABILIZATION IS ACHIEVED BY MULCHING, PLASTIC COVERING AND <br />SEEDS. <br />ELEMENT #6 - PROTECT SLOPES: <br />SLOPES ARE PROTECTED BY PLASTIC COVERING, MULCHING AND SEEDS. <br />ELEMENT #7- PROTECT DRAIN INLETS: <br />INLET PROTECTIONS ARE PROPOSED FOR THE STORM DRAINS. <br />ELEMENT#8 - STABILIZE CHANNELS AND OUTLETS. NIA <br />ELEMENT #9 - CONTROL POLLUTANTS: <br />ALL VEHICLES, EQUIPMENT AND PETROLEUM PRODUCT <br />STORAGEIDISPERSING AREAS WILL BE INSPECTED REGULARLY TO <br />DETECT ANY LEAKS OR SPILLS, AND TO IDENTIFY MAINTENANCE NEEDS <br />AND PREVENT LEAKS OF SPILLS. <br />ELEMENT J10 - CONTROL DEWATERING: <br />THERE WILL BE NO DEWATERING AS PART OF THIS CONSTRUCTION <br />PROJECT. <br />ELEMENT j11- MAINTAIN BMP's: <br />ALL TEST BMPs SHALL BE MAINTAINED AND REPAIRED AS NEEDED. <br />ELEMENT P2 - MANAGE THE PROJECT. <br />THIS COULD BE ACHIEVED BY MINIMIZING THE EXTENT AND DURATION <br />OF THE AREA EXPOSED AND BY EMPHASIZING EROSION CONTROL THEN <br />SEDIMENT CONTROL. <br />ELEMENT #13 - PROTECT ON -SITE STORMWATER MANAGEMENT BMP'S <br />FOR RUNOFF FROM ROOFS AND OTHER HARD SURFACES: NIA <br />1. APPROVAL OF THIS EROSIONISEDIMENTATION CONTROL (ESC) PLAN <br />DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR <br />DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, <br />RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, <br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC <br />FACILITIES IS THE RESPONSIBILITY OF THE APPLICANTICONTRACTOR <br />UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATIONILANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN <br />SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. <br />DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE <br />FLAGGED CLEARING LIMITS SHALT_ BE PERMITTED. THE FLAGGING SHALL <br />BE MAINTAINED BY THE APPLICANTICONTRACTOR FOR THE DURATION <br />OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN <br />CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN <br />SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN <br />WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE <br />APPLICABLE WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br />CONSTRUCTION PERIOD, THESE ESC FACILITES SHALL BE UPGRADED <br />AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT <br />SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED <br />BY THE APPLICANTICONTRACTOR TO ENSURE THEIR CONTINUED <br />FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND <br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS <br />FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED <br />TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS <br />AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE <br />CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO <br />THE DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE <br />BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF <br />THE PROJECT ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE <br />THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE <br />PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO <br />REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br />11, APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM <br />ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL. <br />12. BARE ANDIOR DISTURBED SOILS SHALL REMAIN UNCOVERED ANDIOR <br />UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 <br />THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY I <br />THROUGH SEPTEMBER 30. <br />AVERAGE <br />RMSHED FLOOR <br />FMShED FLOOR '. <br />LOT # <br />ELEVATIONS <br />A <br />B <br />c <br />D <br />ELEVATION <br />1 <br />193 <br />191.8 <br />193.9 <br />195.18 <br />193.90 <br />193.7 <br />2 <br />194.60 <br />195.13 <br />195.09 <br />195.02 <br />194.23 <br />194.87 <br />CAU IC) ° <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br />PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS AND THEN SHALL <br />INCLUDE CALLING UTILITY LOCATE ® 1-800-424-5555 POTHOLING ALL OF THE <br />EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY <br />VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS <br />SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC <br />INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, <br />THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO <br />RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION, <br />COWSTRUCTIOWSEQUENCE <br />1. PRIOR TO CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL <br />SCHEDULE AND ATTEND PRE -CONSTRUCTION CONFERENCE WITH THE <br />CITY OF EVERETT INSPECTION UNIT AND EROSION CONTROL SPECIALIST. <br />2. FLAG CLEARING LIMITS AND INSTALL SILT FENCE AS SHOWN. <br />J. INSTALL ROCK CONSTRUCTION ENTRANCE. <br />4. CLEAR AND GRUB ROAD AREAS, AND STOCKPILE AREAS. INSTALL <br />TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S SUCH AS SILT <br />FENCE, INLET PROTECTION, ETC. <br />5, GRADE AND STABILIZE ROAD WITH GRAVEL BASE. COVER EXPOSED <br />SOILS WITH MULCH, HOG FUEL OR HYDROSEED. <br />6. CONSTRUCT WATER AND STORM UTILITIES. INSTALL GAS, POWER, <br />TELEPHONE AND CABLE UTILITIES, AS REQUIRED. <br />7. PLACE AND POUR CURBS AND GUTTERS. <br />8. PAVE DRIVEWAY. <br />9. HYDROSEED REMAINING EXPOSED SOILS AND STABILIZE PROJECT. <br />10. FLUSH STORM DRAINAGE SYSTEM AND REMOVE SEDIMENTATION IN ALL <br />CATCH BASINS. <br />11, ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED <br />WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR <br />AFTER THE TEMPORARY BMP's ARE NO LONGER NEEDED. TRAPPED <br />SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED <br />SOIL AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY <br />STABILIZED. <br />CESCL CONTACT INFORMATION MUST BE SUBMITTED <br />TO CITY INSPECTOR PRIOR TO ANY WORK. <br />MOMS. - <br />CITY STREETS ARE TO BE KEPT CLEAN OF DIRT AND DEBRIS AT <br />ALL TIMES DURING CONSTRUCTION. DUST SUPPRESSION AND <br />STREET CLEANING MUST OCCUR AS DIRECTED BY PUBLIC WORKS <br />INSPECTOR. <br />ALL EXPOSED GROUND MUST BE RESEEDED WITHIN 30 DAYS OF <br />COMPLETION OF CONSTRUCTION. IF RESEEDING IS NOT PRATICAL <br />DUE TO WEATHER OR SEASONAL PROBLEMS, THE GROUND MUST <br />BE COVERED WITH MULCH AS DIRECTED BY THE CITY ENGINEER. <br />TEMPORARY EROSION CONTROL MEASURES FOR CONSTRUCTION <br />ACTIVITY MUST BE OPERATIONAL PRIOR TO COMMENCEMENT OF <br />ANY CLEARING OR EARTHWORK. <br />MOTE - <br />ALL ACCESS ROADS AND DRIVEWAYS SHALL HAVE A <br />MAXIMUM GRADE OF 15% TO MEET TRAFFIC STANDARDS. <br />