Laserfiche WebLink
SW 14, SE 1149 SEC 34, T® m <br />CITY F ETT, WASHINGTON <br />I <br />DOTES'-""" <br />ATTACH IN <br />A MANNER THAT POST SEE WSDOT STANDARD <br />ASSURES FABRIC IS FIRMLY SPECIFICATIONS 8-01.3(9)A 1. INSTALLTHE ENDS OF THE SILT FENCE TO POINT <br />HELD BY THE BACKUP SLIGHTLY UPSLOPE TO PREVENT SEDIMENT FROM <br />SUPPORT IN A WAY THAT FLOWING AROUND THE ENDS OF THE FENCE. <br />REDUCES THE POTENTIAL <br />FOR FABRIC TEARING -� 2. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />_ FASTEN GEOTEXTILE TO WSDOT STANDARD SPECIFICATIONS 8-01.3(9)A <br />POST EVERY 6" IN O.C. AND 8-01.3(15). <br />BACKUP SUPPORT 1 (r l.1 ' <br />I� IrI 3. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS <br />OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN <br />z LOW OR SUMP AREAS, THE FENCE MAY NEED TO <br />-� <br />IM <br />BACKFILLED & jI'll I1i, l✓ ti E� ^ SELF-LOCKING TIE -NYLONS <br />COMPACTED I � III {3 �,>� �--' BE REINSTALLED UNLESS OTHERWISE APPROVED. <br />I I � - 6/6 (MIN GRADE) <br />NATIVE SOIL GEOTEXTILE I/ 4. INSTALL SILT FENCING PARALLEL TO MAPPED <br />MIN TENSILE STRENGTH, <br />UV STABILIZED CONTOUR LINES. <br />t {, UV STABILIZED <br />FLOW <br />t _ <br />i S. DURING EXCAVATION, MINIMIZE DISTURBING <br />a THE GROUND AROUND TRENCH AS MUCH AS IS <br />FEASIBLE, AND SMOOTH SURFACE FOLLOWING <br />a d� EXCAVATION TO AVOID CONCENTRATING FLOWS. <br />COMPACTION MUST BE ADEQUATE TO PREVENT <br />BURY GEOTEXTILE <br />UNDERCUTTING FLOWS. <br />IN TRENCH <br />a <br />f sin BACKUPSUPPORT <br />z GEOTEXTILE FOR SILT FENCE 41 (TYPICAL) <br />SEE STANDARD SPECIFICATION F a li 0� STEEL POST' <br />N� I F� (TYPICAL)- <br />SECTION 9-33.2 (1), TABLE 6 ) <br />I <br />. ! s {I�i�,� I ' r�� ��✓ <br />R <br />TYPICAL INSTALLATION DETAIL FABRIC <br />- ------------ <br />(GEOTEXTILE) <br />(TYPICAL) <br />INSTALL BACKUP SUPPORT FOR <br />THE GEOTEXTILE SEE STANDARD y1�I I I <br />� <br />5 <br />SPECIFICATION SECTION 8.01.3(9)AI� i II <br />T�"!III¢ <br />I II <br />i P P <br />;, ; ,1 7•;,I � .I P p SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER <br />TO PREVENT SILT LADEN WATER FROM <br />O ESCAPING THROUGH THE <br />p G <br />FENCE AT THE OVERLAP. <br />SPLICE DETAIL <br />g <br />tr <br />b i ' WSDOT' STD PLAN 1-30.10-02 ACCEPTABLE SUBSTITUTE <br />I j ,I �- e TYPICAL SILT FENCE EXCEPT STEEL POST REQUIRED <br />W WITH BACKUP SUPPORT <br />a---- <br />�_ <br />ISOMETRIC r'CITY OF EVERETT <br />-- _ <br />�"� W e�fl PUBLIC WORKS DEPARTMENT <br />�` <br />�� Mumber Mo L ` - 1 <br />tkfiYAN SA55 HEATHER GRIFFIN APAUWILHELM wESH 03/17/2017 <br />g <br />frvonxu opgvwn nc, nc, o' <br />TEMPORARY SILT FENCE 214 <br />TEMPORARY SILT FENCE <br />N.T S. (STD. DWG. 214) <br />NOTES <br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL <br />MEET THE REQUIREMENTS OF WSDOT STANDARD <br />SPECIFICATION SECTION 8-01.3(7). <br />INSTALL DRIVEWAY CULVERT <br />IF THERE IS A ROADSIDE DITCH <br />25, PRESENT <br />25` <br />i E)C\STI(�1G ROPD <br />30' MIN TYPICAL <br />PERMEABLE BALLAST TYPICAL SEE <br />STANDARD SPECIFICATION <br />SECTION 9-03.9(2) <br />\ J <br />LENGTH AS REQUIRED 100' MIN, EXCEPT 1 MIN <br />DEPTH <br />MAY BE REDUCED TO 50' MIN FOR <br />TYPICAL <br />SITES WITH LESS THAN ONE ACRE <br />OF EXPOSED SOIL OR APPROVED BY INSPECTOR <br />PLACE CONSTRUCTION GEOTEXTILE FOR SOIL <br />Y <br />STABILIZATION FROM THE EDGE OF THE EXISTING <br />PROVIDE FULL WIDTH OF <br />3 <br />ROADWAY TO THE CONSTRUCTION ENTRANCE, <br />INGRESS/EGRESS AREA <br />OR AS DIRECTED BY THE ENGINEER <br />15' MIN <br />0 <br />ISOMETRIC VIED <br />CONSTRUCTION ENTRANCE WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE <br />CITY OF EVERETT <br />a <br />(,fifi <br />' .au PUBLIC WORKS DEPARTMENT <br />0 o <br />maa., <br />ERYANSA55 HEATWLRGRIFFIN�M ESH 04/03/2017 <br />EQo <br />CONSTRUCTION ACCESS 201 <br />CONS TRUCTI®NACCESS <br />N.T.S. (STD. DWG. 201) <br />CAUTI° <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br />PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS AND THEN SHALL <br />INCLUDE CALLING UTILITY LOCATE ® 1-800-424-5555 POTHOLING ALL OF THE <br />EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY <br />VERIFY WHETHER OR NOT CONFLICTS EXIST LOCATIONS OF SAID UTILITIES AS <br />SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC <br />INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, <br />THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO <br />RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />NOTES <br />1. SHAPE OF SUMP AREA MAY VARY TO FIT DRAINAGE <br />AREA AND TERRAIN. MODIFY AS NECESSARY TO <br />WASHED GRAVEL <br />ENSURE SATISFACTORY TRAPPING OF SEDIMENT. <br />SEE NOTE 4 <br />HALF -CIRCLE SUMP MAY BE USED WHEN CURB AND <br />GUTTER ARE INSTALLED DURING STREET <br />CONSTRUCTION. <br />0000000c / <br />2. CLEAN OUT WHEN SEDIMENT REACHES 6" BELOW <br />GRATE. <br />L <br />- <br />� �03. <br />TEMPORARILYLE-AVEOUTBLOCK.COVEROPENING <br />0000 <br />OocWITH <br />WIRE SCREEN. SIZE SCREEN TO RETAIN GRAVEL. <br />- - - - - - <br />4. PLACE 3/8" MINUS WASHED GRAVEL IN FRONT OF <br />SCREEN TO FILTER SEDIMENT. <br />'- <br />5. SIZE SUMP BASED ON EXPECTED FLOWS DURING <br />CONSTRUCTION. <br />SEE NOTE <br />7. <br />SCREEN <br />NOTE <br />3 <br />6. TO PREVENT SEDIMENTATION FROM ENTERING <br />PLAN VIEW <br />STORM <br />STORM DRAINAGE SYSTEM AT CATCH BASIN/INLETS <br />DURING CONSTRUCTION. <br />SCREEN <br />GRAVEL <br />SEE NOTE 3 <br />SEE NOTE 4 <br />' <br />. o°o°0 0 0° <br />.;OOp 000 ,., OVOOOOI <br />' <br />000000 '- JOOOOO <br />J0000000 00O0000 <br />�, <br />t� <br />� <br />MAX SLOPE 2:1 <br />� <br />p000p y.)00000 <br />-SEE NOTE 2 <br />SEE <br />NOTE 5 <br />y <br />o <br />o <br />CITY OF EVERETT <br />za <br />r PUBLIC <br />q� <br />71EV <br />}HYAN SA55 H7Ar G'PRSECTI�V <br />�Ul WILHELM W[SH� 63/72017 <br />a\ <br />EXCAVATED INLET N <br />4 a <br />PROTECTION 208 <br />2 EXCA VATED INLET PROTECTION <br />�,2 N.T.S. (STD. DWG. 208) <br />TESC & GRADING NOTES <br />1. THE TEMPORARY EROSION CONTROL SYSTEM SHALL BE INSTALLED PRIOR TO ALL OTHER CONSTRUCTION. <br />2. WHERE PO' S&'SLE, MAINTAIN NATURAL VEGETATION FOR SILT CONTROL. <br />3. AS CONSTRUCTION PROGRESSES AND SEASOIAL CONDITIONS DICTATE, THE EROSION CONTROL FACILITIES <br />SHALL BE MAINTAINED ANDIOR ALTERED AS REQUIRED BY THE CITY ENGINEER TO ENSURE CONTINUING <br />EROSION/SEDIMENTATION CONTROL. <br />4. ALL DISTURBED AREAS THAT WILL BE LEFT FOR 30 DAYS OR MORE DURING THE PERIODS OF MARCH 1 TO <br />MAY 15 AND AUGUST 15 TO OCTOBER 1 SHALL BE IMMEDIATELY SEEDED WITH A MIX AND BY A METHOD <br />APPROVED BY THE CITY OF EVERETT PUBLIC WORKS DEPARTMENT AND MAINTAINED UNTIL SEED GERMINATION <br />IS ASSURED. IN ADDITION TO SEEDING, SLOPES OF 25Y. OR GREATER WILL BE MULCHED WITH 2.0 TONS OF <br />STRAW PER ACRE, OR WITH AN APPROVED EQUAL. <br />DURING THE REST OF THE YEAR, TEMPORARY SOIL STABILIZATION MUST BE APPLIED IMMEDIATELY TO <br />DISTURBED AREAS THAT WILL BE LEFT EXPOSED FOR 7 DAYS OR MORE, AND IMMEDIATELY TO SLOPES <br />GREATER THAN 257. WILL BE LEFT EXPOSED FOR 3 DAYS OR MORE <br />5. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND DEBRIS FROM THE SITE WILL <br />NOT BE ALLOWED. FAILURE TO COMPLY WITH THIS CONDITION WILL RESULT IN ALL WORK ON THE SITE <br />BEING STOPPED, <br />6. GRADING OUTSIDE CITY RIGHT-CF-WAY SHALL CONFORM TO CHAPTER 70, UNIFORM BUILDING CODE. <br />7 COMPACT ALL FILLS TO MINIMUM 95% MAXIMUM DENSITY <br />8. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO <br />INSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. AS CONSTRUCTION <br />PROGRESSES AND UNEXPECTED (SEASONAL) CONDITIONS DICTATE, MORE SILTATION CONTROL FACILITIES MAY <br />BE REQUIRED TO INSURE COMPLETE SILTATION CONTROL OF THE PROPOSED PROJECT THEREFORE, DURING <br />THE COURSE OF CONSTRUCTION IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO <br />ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL <br />FACILITIES THAT MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES. <br />9. SUITABLE NATIVE MATERIAL EXCAVATED DURING TRENCHING SHALL BE USED FOR TRENCH BACKFILL UNLESS <br />NOTIFIED BY THE CITY ENGINEER THAT THE NA77VE MATERIAL IS UNSUITABLE. THE CITY ENGINEER, OR HIS <br />REPRESENTATIVE, WILL EXAMINE EXCAVATED NATIVE MATERIAL AT THE TIME OF EXCAVATION TO DETERMINE ITS <br />SUITABILITY FOR USE AS BACKFILL. NATIVE MATERIAL WILL BE CONSIDERED SUITABLE FOR TRENCH BACKFILL <br />IF IT IS: <br />A. CAPABLE OF ATTAINING THE DEGREE OF COMPACTION SPECIFIED IN D COMPACTION. <br />B. WITHIN REASONABLE TOLERANCE OF OPTIMUM MOISTURE CONTENT <br />C. REASONABLY FREE OF ORGANIC MATERIAL, CLAY FROZEN LUMPS, ROCKS OR OTHER DELETERIOUS <br />MATTER. <br />10. UNSUITABLE BACKFILL MATERIAL SHALL BE REMOVED FROM THE SITE AND HAULED TO AN APPROVED <br />DISPOSAL SITE THE CITY ENGINEER SHALL BE PROVIDED WITH THE LOCATION OF ALL DISPOSAL SITES TO <br />BE USED AND ALSO COPIES OF THE PERMITS AND APPROVALS OF SUCH DISPOSAL SITES. <br />11. IMPORTED MATERIAL SHALL MEET THE REQUIREMENT OF GRAVEL BORROW AS SPECIFIED IN SECTION 3.16.1.3 <br />OF THE DESIGN AND CONSTRICTION STANDARDS AND SPECIFICATIONS, OR CRUSHED SURFACING TOP COURSE <br />AS SPECIFIED IN SECTION 9-03.9(3) OF THE 7991 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND <br />MUNICIPAL CONSTRUCTION. <br />12. TRENCH BACKFILL SHALL BE SPREAD IN LAYERS AND COMPACTED BY MECHANICAL TAMPERS OF THE IMPACT <br />TYPE APPROVED BY THE CITY ENGINEER. THE BACKFILL MATERIAL SHALL BE PLACED IN SUCCESSIVE LAYERS <br />WITH THE FIRST LAYER NOT TO EXCEED 2 FEET ABOVE THE PIPE, AND THE FOLLOWING LAYERS NOT <br />EXCEEDING 12 INCHES IN LOOSE THICKNESS, WITH EACH LAYER BEING COMPACTED TO THE DENSITY <br />SPECIFIED BELOW: <br />A. IMPROVED AREA SUCH AS STREET AND SIDE WALK AREAS SHALL BE COMPACTED TO 90r. OF MAXIMUM DRY <br />DENSITY TO WITHIN 3 FEET OF SUBGRADE. THE LAST 3 FEET SHALL BE COMPACTED TO 95r. OF MAXIMUM <br />DRY DENSITY <br />B. UNIMPROVED AREAS OR LANDSCAPE AREAS SHALL BE COMPACTED TO 901wo OF MAXIMUM DRY DENSITY. <br />13, TEMPORARY SILTATION PONDS AND ALL TEMPORARY SILTATION CONTROLS SHALL BE MAINTAINED IN A <br />SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED, <br />PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL, AND THE POTENTIAL FOR EROSION HAS PASSED. <br />14. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE, NOR LOCATION OF PIPES, <br />RESTRICTORS, OR DETENTION FACILITIES, BUT 1S AN APPROVAL OF GRADING AND SEDIMENTATION CONTROL <br />PLAN ONLY <br />TES NOTES <br />1. ALL ENVIRONMENTALLY SENSITIVE AREAS AND THEIR BUFFERS SHALL BE FLAGGED FOR EASY IDENTIFICATION <br />BEFORE CLEARING TAKES PLACE, AFTER THESE AREAS ARE FLAGGED AND CLEARING LIMITS ARE APPROVED, <br />AN AREA WIDE ENOUGH TO INSTALL A SILT FENCE AT THE CLEARING LIMITS, BY HAND OR MECHANICAL <br />METHODS, MAY BE CLEARED. THE TOP OF THE SILT FENCE SHALL BE REFLAGGED AFTER INSTALLATION IF A <br />SILT FENCE IS NOT REQUIRED, THE AREA SHALL BE DELINEATED USING AN ORANGE BARRIER, <br />2. ALL PERIMETER EROSION AND SEDIMENT CONTROL SHALL BE CONSTRUCTED, OPERATIONAL, AND INSPECTED <br />BY THE PUBLIC WORKS INSPECTOR PRIOR TO INITIATION OF CLEARING AND GRUBBING OPERATIONS. <br />3. DANGER TREES SHALL BE IDENTIFIED THROUGH A JOINT INSPECTION INVOLVING BOTH THE DEVELOPED AND <br />PUBLIC WORKS INSPECTOR. NO TREES SHALL BE REMOVED UNTIL PERMISSION IS OBTAINED FROM THE <br />APPROPRIATE PARTIES. <br />4. WHERE POSSIBLE, NATURAL VEGETATION SHALL BE MAINTAINED FOR EROSION AND SEDIMENT CONTROL. <br />5. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION CONTROL FACILITIES <br />SHALL BE MAINTAINED AND/OR ALTERED AS REQUIRED TO ENSURE CONTINUING EROSIONISEDIMENT <br />CONTROL. <br />6. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE NOR LOCATION OF <br />PERMANENT PIPES, RESTRICTORS, OR DETENTION FACILITIES, BUT IS AN APPROVAL OF EROSION AND <br />SEDIMENT CONTROL BMP'S ONLY <br />Z THE WASHINGTON STATE CLEAN AIR ACT REQUIRES THE USE OF ALL KNOWN, AVAILABLE AND REASONABLE <br />MEANS OF CONTROLLING AIR POLLUTION, INCLUDING DUST DUST CAN BE CONTROLLED BY WETTING <br />EXPOSED SOILS, WASHING TRUCK WHEELS BEFORE LEAVING THE SITE, AND INSTALLING AND MAINTAINING <br />ROCK CONSTRUCTION ENTRANCES. CONSTRUC77ON VEHICLE TRACKOUT IS A MAJOR SOURCE OF DUST AND <br />ANY EVIDENCE OF TRACKOUT CAN TRIGGER FINES FROM THE DEPARTMENT OF ECOLOGY OR THE PUGET <br />SOUND AIR POLLUTION CONTROL AGENCY <br />8. EVERY EFFORT SHALL BE MADE TO CLOSE UTILITY LINES BY THE END OF THE DAY AND MATERIAL <br />EXCAVATED DURING UNDERGROUND UTILITY CONSTRUCTION SHALL BE PLACED ON THE UPHILL SIDE OF <br />TRENCHES (WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS). <br />NOTES <br />1. CITY STREETS ARE TO BE KEPT CLEAN OF DIRT AND DEBRIS AT ALL TIMES DURING CONSTRUCTION. DUST <br />SUPPRESSION AND STREET CLEANING MUST OCCUR AS DIRECTED BY PUBLIC WORKS INSPECTOR.. <br />2. ALL EXPOSED GROUND MUST BE RESEEDED WITHIN 30 DAYS OF COMPLETION OF CONSTRUCTION. IF <br />RESEEDING IS NOT PRATICAL DUE TO WEATHER OR SEASONAL PROBLEMS, THE GROUND MUST BE COVERED <br />WITH MULCH AS DIRECTED BY THE CITY ENGINEER. <br />J. TEMPORARY EROSION CONTROL MEASURES FOR CONSTRUCTION ACTIVITY MUST BE OPERATIONAL PRIOR TO <br />COMMENCEMENT OF ANY CLEARING OR EARTHWORK. <br />4. ANY GRADING/FILL ON THIS SITE SHALL BE DONE IN A MANNER THAT DOES NOT IMPACT THE SURROUNDING <br />PROPERTIES. <br />EROSION CONTROL DEVICES NOTES <br />ADDITIONAL EROSION AND SEDIMENT CONTROL MAY BE REQUIRED AS PER INSPECTORS DIRECTION DURING <br />CONSTRUCTION. <br />EASEMENTAND UTILITY TES <br />1. 5" MIN SEPARATION BETWEEN CITY OPERATED UTILITIES AND OTHER PRIVATE AND PUBLIC OPERATED UTILITIES <br />(PUD, CABLE TV, PHONE GAS ETC.) <br />2. NON CITY OPERATED PUBLIC UTILITIES MAY CROSS CITY EXCLUSIVE EASEMENT ONLY BETWEEN 450 AND 900 <br />WITH RIDGED STEEL CONDUIT OR PVC CONDUIT ENCASED IN RED CONCRETE AT THE PUBLIC WORKS <br />INSPECTORS OPTION. <br />J. CONDUIT DUCTING SHALL HAVE A MINIMUM COVER OF 3' AND NOT OBSTRUCT CROSSING BY OTHER UTILITIES <br />FOR A VERTICAL DISTANCE GREATER THAN 3` IN EITHER EASEMENT <br />4. ONLY CITY OPERATED UTILITIES SHALL BE ALLOWED WITHIN CITY EXCLUSIVE EASEMENT NO OTHER <br />EASEMENTS MAY BE GRANTED WITHIN THE LIMITS OF THIS EASEMENT. <br />-GENERAL NOTES <br />1. FOR ANY EASEMENT ACCESS OR EASEMENT WITH PUBLIC UTILITIES, THE CITY ENGINEER SHALL DETERMINE <br />THE REQUIRED EASEMENT WIDTH BASED ON CITY STANDARDS. <br />2. WITH THE EXCEPTION OF THE EASEMENT ACCESS DRIVE NO NEW DRIVEWAYS OR PARKING AREAS WILL BE <br />PERMITTED WITHIN THE FRONT YARD SETBACK AREA FOR ALL LOTS THAT FRONT ON THE PUBLIC STREET <br />3. ACCESS OFF AN EASEMENT DRIVE IS LIMITED TO ONE TWENTY FOOT DRIVEWAY AND CURB CUT PER LOT. <br />THE DRIVEWAY SHALL NOT EXCEED TWENTY FEET IN WIDTH FOR A DISTANCE OF TWENTY FEET FROM THE <br />EASEMENT ACCESS DRIVE CURB. THE MINIMUM PARKING STALL WIDTH FOR TWO CARS IN FRONT OF THE <br />GARAGE IS 20 FEET BY 20 FEET - TWO (2) STALLS. THE MINIMUM PARKING PAD FOR 4 OFF-STREET IS <br />20 FEET BY 40 FEET <br />4. SURFACE PARKING: EMC18.28.120 SURFACE PARKING IS ONLY PERMITTED ON A LOT WITH AN EXISTING <br />HOUSE. THE PARKING AREA MAY NOT BE BETWEEN THE EXISTING HOUSE AND THE PUBLIC STREET THE <br />PARKING PAD MUST BE A MINIMUM OF 20 FEET BY 40 FEET AND BE A MINIMUM OF 5 FEET AWAY FROM <br />ANY NEW PROPERTY LINE AND MAY NOT BE WITHIN THE REQUIRED OPEN SPACE. <br />5. GARAGES: ENC18.28.150 ON ALL NEW LOTS WHERE PROPOSED SINGLE FAMILY DWELLINGS ARE PROPOSED A <br />TWO (2) CAR GARAGE IS REQUIRED. <br />6. EMC18.28.120 ALL DEVELOPMENT STANDARDS FOR EASEMENT ACCESS DRIVE MUST BE MET. <br />CONTRA CTORESPONSIBILITY FOR ER OSIONISLLTATI N CONTR OL <br />IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN THAT STORM WATER RUNOFF BE <br />CONTROLLED AT ALL TIMES TO PREVENT SOIL EROSION AND TO MAINTAIN WATER QUALITY. ANY AND ALL <br />MEASURES NECESSARY TO DO SO SHALL BE EMPLOYED BY THE CONTRACTOR. <br />1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE CONTRACTOR SHALL BE FULLY <br />RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON THE SITE AND THAT POLLUTED OR <br />SILT -LADEN RUNOFF DOES NOT LEAVE THE SITE OR ENTER INTO ANY CREEK, STREAM, WETLAND OR <br />WATER BODY ON THE SITE. <br />2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR SELECTING AND IMPLEMENTING APPROPRIATE METHODS, "BEST MANAGEMENT PRACTICES" (BMPS), FOR <br />STORM WATER TREATMENT AND CONTROL THAT MEET THE REQUIREMENTS OF BOTH THE WASHINGTON STATE <br />DEPARTMENT OF ECOLOGY AND THE CITY OF EVERETT <br />3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE PROJECT ENGINEER <br />AND THE CITY INSPECTOR. IN THE EVENT THAT THE INSTALLED WATER QUALITY CONTROL MEASURES ARE <br />INEFFECTIVE AT CONTROLLING EROSION AND SILTATION, THE CONTRACTOR SHALL IMMEDIATELY REPORT TO <br />AND CONSULT WITH THE PROJECT ENGINEER TO FIND AN APPROPRIATE REMEDY. ALL CONSTRUCTION <br />ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SILTATION CONTROL MEASURES, SHALL CEASE UNTIL <br />SUCH TIME AS THE WATER QUALITY IS BROUGHT UNDER CONTROL. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND ANTICIPATING STORM <br />ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN ANTICIPATION OF THE WEATHER. <br />5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPS SHALL BE STORED ON SITE AND SHALL <br />BE IMMEDIATELY AVAILABLE FOR USE SUCH SUPPLIES AND MATERIALS SHALL INCLUDE, BUT NOT BE LIMITED <br />TO, STRAW BALES OR OTHER MULCHING MATERIAL, SILT FENCING AND STAKES, FILTER FABRIC, ETC. <br />6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, CONTRACTOR SHALL MONITOR ALL EROSION <br />CONTROL MEASURES AND SHALL PRIORITIZE IMPLEMENTATION AND MAINTENANCE OF EROSION AND SILTATION <br />CONTROL MEASURES ABOVE ALL OTHERS: <br />