Laserfiche WebLink
OUTFALL PER -- <br />DETAIL 1 <br />SHEET 4 <br />INSTALL RIP RAP AT BASE OF DIFFUSER <br />TEE, AS REQUIRED BY BNSF <br />15' PRIVATE DRAINAGE <br />1. <br />n rCi� ..ter EASEMENT n <br />ANCHOR PIPE ON SLOPE W/ #4 "U" SHAPED <br />REBAR BENT TO PIPE, SPACED 25' OC. <br />1 . <br />REBAR TO BE SET A MINIMUM 30" INTO . 1 <br />GROUND. PIPE TO BE CONTINUOUSLY <br />FUSED.. <br />.et. <br />1 <br />1 <br />, <br />2 ® rIb <br />.. `V ✓10 <br />10' WIDE SEWER <br />EASEMENT <br />- FILTER FABRIC FENCE <br />SCALE: 1 "-20 FEET NOTE: <br />OUTFACE THE DESIGN IS PRELIMINARY AND CONTINGENT UPON BNSF <br />PROTECTION D 20 40 APPROVAL. <br />1 <br />PER BlEtA r eN'; i1 <br />ET 4- COY LLFD NOTE: <br />INSTALL &' C FINAL MAINTENANCE AND OPERATION OF THE DRAIN <br />HDPE CONTINUOUSLY WITHIN STEEP SLOPE DOWN TO THE DIFFUSER TEE AND <br />-- FUSED ON TOP OF SLOPE ON -SITE SHALL BE THE RESPONSIBILITY OF THE PROPERTY <br />ANCHOR PER DETAIL, ALL OWNER(S). <br />JOINTS SHALL BE <br />:- RESTRAINED ON SLOPE <br />WORK WITHIN <br />RAILROAD ROW <br />UNDER SEPARATE <br />j. PERMIT. (SEE NOTE) <br />SLOPE PROTECTION <br />AND STABILIZATION <br />1 PER BMP C120 <br />BMP C233 <br />PER n , <br />(TYP) - <br />-- <br />i <br />X _ <br />_J <br />CIDLOT B -- - <br />X 00 23,096 SF <br />28r FRENCH DRAIN ! ' <br />PER DETAIL ! <br />I 1 - <br />SHEET 5 I <br />__---> <br />�1 3Or X m ___-----�>��> BRICK I L <br />X m211 S.F.PAVERS/PLANTER <br />DECK ! T: <br />TO BE <br />L1 <br />. EMOVED i 1 <br />EX DECK <br />m DS1,123 SF-> - - - <br />PROPOS !� <br />LO = ADD 938 <br />d, A 4" PVC <br />d' (TYP) <br />O m n <br />m <br />o X n 2325 <br />r X TAYLOR DR .j , <br />os <br />Z X J <br />W <br />m <br />X <br />- 1 <br />I / � <br />I � <br />I <br />- -> t / <br />X <br />110' PRIVATE , <br />X I DRAINAGE ; �! <br />�? EASEMENT / 7, <br />X I � <br />X i <br />X 1 138 .� <br />ZIG-ZAG LINE (� 1 6" P2% <br />DEPICTS CONSTRUCTION x l,' �, �iSL.OPE <br />LIMITS (TYP) I <br />S A(ItED DRIVE <br />FILTER FABRIC FENCE i <br />C233 ' ��� //!;! E 1�88 SF j ! <br />1 <br />(TYP)- �- X I \ �I DS� 142. 65'DS <br />I <br />X S L <br />15` WATER I X COT +- <br />,. _. <br />�. I � A ... ! , <br />EASEMENT �� GROSS AREA <br />142' 11,037 SF A ( P C TY <br />4' CHAINL)NK NET AREA I . <br />FENCE ON I a 9,049 SF N c 1 <br />CONIC RET 44.74' �45.3 'X L <br />WALL X !1 Dc� PROPOSED j <br />HOUSE I ! <br />IE 1,835 SF ^ <br />II FF 148.50 <br />1 <br />,> <br />! \ , 2329 <br />148 X. v� <br />TAYLOR�\\ 1� <br />\I <br />DR A , LL <br />WATER UTILITY <br />EASEMENT 1 X D > >�� <br />I <br />X ' NEW CB PER CITY <br />_ 1 i <br />STANDARDS PER <br />DETAIL 401, BMP <br />4 _ C 220 SHEET 5 <br />CB INLET <br />UJ <br />m i PROTECTION PER <br />m_ 11 DET 208 SHEET 3 <br />7 8 <br />4 @ 2% MIN <br />7 I .I. 01 <br />r � <br />m <br />A i <br />16 S.F. PAVER <br />TO BE <br />REMOVED <br />CORRUGATED HDPE <br />@ 2% MIN <br />NEW CB PER CITY <br />- ' STANDARDS PER <br />DETAIL 401, SHEET 5 <br />CB INLET <br />PROTECTION PER <br />DET 208 BMP <br />C220, SHEET 4 J <br />1 FIR <br />-12 IiR <br />7r, <br />6" SANITARY <br />a SEWER <br />LATERAL <br />CONSTRUCTION ENTRANCE <br />PER COE STD DETAIL #201 <br />T &`BMP C105 <br />-=FnIO 1io <br />0.58'W x 0.08'S h <br />IDENING <br />S8203614 502.65------- <br />N __-- <br />r v rgrvrfimry rvm FA 'L INLET ----"` PROP 3/4°- -- -- _ <br />__ - <br />t---yPROTECTION - WATER® <br />PER BMP C220 : SERVICE <br />82°38„� 11W C)57.79 <br />TEMPORARY EROSION AND SEDIMENTATION CONTROL <br />STANDARD NOTES: <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN <br />APPROVAL OFPERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, <br />RESTRICTORS, CHANNELS,RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br />APPUCANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN <br />THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND <br />THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE <br />APPUCANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACIUTIESSHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL <br />CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND <br />SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE <br />WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED <br />SITE CONDITIONS. DURING THE CONSTRUCTON PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS <br />NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN <br />WATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE <br />APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM <br />EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE <br />A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A <br />TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO <br />PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE <br />DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION <br />AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO <br />ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT <br />TRACKED OFFTHE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER <br />BODIES IF THE PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBEDSOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE <br />THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 <br />THROUGH SEPTEMBER 30. <br />1. Preserve Vegetation/Mark Clearing Limits: <br />X BMP C101: Preserving Natural Vegetation <br />DBMP C102: Buffer Zones <br />❑BMP C103: High Visibility Plastic or Metal Fence <br />2. Establish Construction Access: <br />X BMP C105: Stabilized Construction Entrance/Exit ❑BMP <br />C106: Wheel Wash <br />❑BMP C107: Construction Road/Parking Area Stabilization <br />3. Control Flow Rates: <br />❑BMP C203: Water Bars <br />El BMP C240: Sediment Trap <br />❑BMP C241: Temporary Sediment Pond <br />X Not Applicable To My Proposed Project <br />4. Install Sediment Controls: <br />❑BMP C231: Brush Barrier <br />❑BMP C232: Gravel Filter Berm <br />X BMP C233: Silt Fence <br />❑BMP C234: Vegetated Strip <br />❑BMP C235: Wattles <br />❑BMP C240: Sediment Trap <br />❑BMP C241: Temporary Sediment Pond <br />S. Stabilize Soils: <br />X BMP C120: Temporary and Permanent Seeding <br />❑BMP C121: Mulching <br />❑BMP C122: Nets and Blankets <br />❑BMP C123: Plastic Covering <br />❑BMP C124: Sodding <br />❑BMP C125: Topsoiling/Composing <br />O BMP C126: Polyacryiamide for Soil Erosion Protection <br />DBMP C130: Surface Roughening <br />❑BMP C131: Gradient Terraces <br />❑BMP C140: Dust Control <br />6. Protect Slopes: <br />X BMP C120: Temporary and Permanent Seeding <br />DBMP C130: Surface Roughening <br />11 BMP C131: Gradient Terraces <br />DBMP C200: Interceptor Dike and Swale <br />❑BMP C201: Grass -Lined Channels <br />❑BMP C203: Water Bars <br />❑BMP C204: Pipe Slope Drains <br />DBMP C205: Subsurface Drains <br />DBMP C206: Level Spreader <br />❑BMP C207: Check Dams <br />DBMP C208: Triangular Silt Dike (Geotextile Encased Check Dam) <br />7. Protect Drain Inlets: <br />X BMP C220: Storm Drain Inlet Protection <br />8. Stabilize Channels and Outlets: <br />DBMP C202: Channel Lining <br />X BMP C 209: Outlet Protection <br />❑Not Applicable To My Proposed Project <br />9. Control Pollutants: <br />❑BMP C151: Concrete Handling <br />❑BMP C152: Sawcutting and Surfacing Pollution Prevention <br />❑BMP C153: Material Delivery, Storage, and Containment <br />DBMP C154: Concrete Washout Area <br />DBMP C250: Concrete Stormwater Chemical Treatment <br />❑BMP C251: Construction Stormwater Filtration <br />❑BMP C252: High H Neutralization Using O g p gC a <br />DBMP C253: pH Control for High pH Water <br />X Not Applicable To My Proposed Project <br />10.Control Dewatering: <br />DBMP C236: Vegetative Filtration <br />X Not Applicable To My Proposed Project <br />11. Maintain BMPs: <br />X BMP C150: Materials On Hand <br />❑BMP C160: Certified Erosion and Sediment Control Lead (CESCL not required on -site for sites <1acre) <br />12. Manage the Project: <br />X BMP C150: Materials On Hand <br />❑BMP C160: Certified Erosion and Sediment Control Lead (CESCL not required on -site for sites < acre) <br />X BMP C162: Scheduling <br />13.Protect Low Impact Development: <br />X BMP C102: Buffer Zones <br />[I BMP C103: High Visibility Plastic or Metal Fence <br />DBMP C200: Interceptor Dike and Swale <br />❑BMP C207: Check Dams <br />DBMP C208: Triangular Silt Dike (Geotextile Encased Check Dam) <br />❑BMP C231: Brush Barrier <br />X BMP C233: Silt Fence <br />❑BMP C234: Vegetated Strip <br />NOTES <br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL <br />MEET THE REQUIREMENTS OF WSDOT STANDARD <br />SPECIFICATION SECTION 8-01.3(7). <br />INSTALL DRIVEWAY CULVERT <br />IF THERE IS A ROADSIDE DITCH <br />25, PRESENT <br />25, <br />ROAD <br />EXtS�\NG <br />30' MIN TYPICAL <br />c <br />PERMEABLE BALLAST TYPICAL SEE <br />STANDARD SPECIFICATION <br />SECTION 9-03.9(2) <br />1' MIN <br />LENGTH AS REQUIRED 100' MIN, EXCEPT DEPTH <br />MAY BE REDUCED TO 50' MIN FOR <br />TYPICAL <br />SITES WITH LESS THAN ONE ACRE <br />OF EXPOSED SOIL OR APPROVED BY INSPECTOR <br />0 <br />N <br />PLACE CONSTRUCTION GEOTEXTILE FOR SOIL <br />STABILIZATION FROM THE EDGE OF THE EXISTING PROVIDE FULL WIDTH OF <br />o <br />ROADWAY TO THE CONSTRUCTION ENTRANCE, INGRESS/EGRESS AREA <br />Z <br />OR AS DIRECTED BY THE ENGINEER 15' MIN <br />Z <br />W <br />a <br />0 <br />W <br />o <br />ISOMETRIC VIEW <br />w <br />N <br />WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE <br />CONSTRUCTION ENTRANCE <br />0 <br />CITY OF EVERETT <br />< <br />Z� <br />PUBLIC WORKS DEPARTMENT <br />O N <br />w o <br />j <br />City Eoglneer Section Manager CAD Manager Drawn By Current Rev Date <br />- RYAN SASS HEATHER GRIFFIN PAUL WILHELM ESH <br />04/03/2017 <br />TITLE <br />y, N <br />STANDARD DRAWING No. <br />CONSTRUCTION ACCESS 201 <br />so <br />a <br />CUT AND FILL QUANTITIES <br />TOTAL CUT = 70 CY <br />TOTAL FILL = 70 CY <br />TOPSOIL NOTE: <br />ALL DISTURBED AND LANDSCAPED SOILS SHALL BE ENHANCED TO <br />MEET BMP T5.13 POST CONSTRUCTION SOIL QUALITY AND DEPTH. <br />O <br />.J <br />o <br />Q <br />E <br />w <br />U <br />Lti <br />w <br />w <br />CL <br />w v <br />w W <br />�' G <br />C5 <br />ca <br />t <br />LU <br />�Cn <br />© <br />� <br />M -C <br />UJ <br />C� <br />i' <br />m <br />Z o <br />In <br />r N J <br />, � <br />o Q <br />OLOCO <br />1-- <br />_� <br />r0Mw <br />Ill <br />Q <br />0 <br />Z <br />to <br />Q <br />r1 <br />!G_J <br />o <br />--' "' <br />C Z <br />V <br />© <br />Z <br />O <br />C031Cr <br />W <br />~ L0 <br />w c� <br />�tt00 <br />�� <br />W� <br />Q <br />0 <O <br />0 S W <br />W�~� <br />ZpJM-� <br />w <br />04 <br />W0M> <br />=J,=> a� <br />acncV w <br />Uv=tom <br />DRAWN BY: EBA <br />DATE: 09-05-2018 <br />AGENCY NO.: <br />SHEET: 2 <br />OF 5 <br />JOB NO.: <br />18-025 <br />REVIEWED FOR PERMIT <br />