Laserfiche WebLink
1. ALL DISTURBED AREAS SUCH AS DETENTION FACILITIES, ROADWAY BACKSLOPES, ETC. SHALL <br />BE SEEDED WITH A PERENNIAL GROUND COVER GRASS TO MINIMIZE EROSION. GRASS <br />SEEDING WILL BE DONE USING AN APPROVED HYDROSEEDER OR AS OTHERWISE <br />APPROVED BY THE CITY OF EVERETT (ONSITE) OR WSDOT (WITHIN WSDOT ROW). <br />2. EFFECTIVE SEEDING IS BEST ACCOMPLISHED DURING THE MONTHS OF APRIL, MAY, JUNE AND <br />SEPTEMBER. SEEDING DURING JULY AND AUGUST MAY REQUIRE SUBSTANTIAL IRRIGATION. <br />SEE WINTER GRADING NOTE ABOVE. <br />3. CONSTRUCTION ACCEPTANCE WILL BE SUBJECT TO A WELL ESTABLISHED GROUND COVER <br />THAT FULFILLS THE REQUIREMENTS OF THE APPROVED CONSTRUCTION PLANS AND THE <br />CITY OF EVERETT, <br />4. IMMEDIATELY FOL0ARNG FINISH GRADING, PERMANENT VEGETATION (CONSISTING OF RAPID PERSISTENT AND LEGUME) WILL BE APPLIED (MINIMUM 30#f PER ACRE). EXCEPT AS NOTED <br />W PLANS, THIS SHALL INCLUDE THE FOLLOWING MIX OF SEEDS: 20%ANNUAL, PERENNIAL <br />OR HYBRID RYE GRASS, 40% CREEPING RED FESCUE, 40% WHITE CLOVER. PLANS MAY <br />SPECIFY DIFFERENT PLANTINGS FOR SPECIALIZED AREAS SUCH AS BIOFILTRAT ION <br />SWALES, DETENTION/INFILTRATION PONDS, WETLAND/BUFFER RESTORATION AREAS, ETC. <br />5. ALL AREAS TO BE SEEDED SHALL BE CULTIVATED TO THE SATISFACTION FACTION OF THE CITY <br />INSPECTOR. THIS MAY BE ACCOMPLISHED BY DISCING, RAKING, HARROWING OR OTHER <br />ACCEPTABLE MEANS. PERFORM ALL CULTURAL OPERATIONS ACROSS OR AT RIGHT <br />ANGLES TO THE SLOPE. IF NECESSARY, SURFACE RUNOFF CONTROL MEASURES SUCH AS <br />GRADIENT TERRACES, INTERCEPTOR, DIKE/SWALES, LEVEL SPREADERS, AND SEDIMENT <br />BASINS SHALL BE INSTALLED PRIOR TO SEEDING. <br />6, FERTILIZER SHALL BE APPLIED AT 400## PER ACRE OF 10-20-20 (10 POUNDS PER 1100 SQUARE <br />FEET) OR EQUIVALENT. DEVELOPMENTS ADJACENT TO WATER BODIES SHALL USE <br />NON -PHOSPHORUS FERTILIZER, <br />7, CONTRACTOR SHALL MONITOR GERMINATION AND GROWTH UNTIL GROUND COVER IS <br />UNIFORMLY ESTABLISHED. THIN AREAS SHALL BE RESEEDED OR OVERSEEDED AS <br />NECESSARY. <br />GRADINGSITE <br />'I . ALL GRADING SHALL COMPLY WITH CHAPTER A33 OF THE UNIFORM BUILDING CODE (CURRENT <br />EDITION). <br />2. PUBLIC STREETS ARE TO BE KEPT CLEAR OF DIRT AND DEBRIS DURING EXCAVATION AND <br />FILL OPERATIONS. <br />3. THE SITE SOILS ARE GENERALLY CONSIDERED MOISTURE SENSITIVE AND AS SUCH ARE <br />SUSCEPTIBLE TO DISTURBANCE BY CONSTRUCTION EQUIPMENT, PARTICULARLY DURING <br />PERIODS OF WET WEATHER. THE GRADING CONTRACTOR SHALL TAKE ALL PRECAUTIONS <br />TO LIMIT SURFACE DISTURBANCE AND PROTECT THE SITE GRADING AREA FROM EXCESSIVE <br />RUNOFF EROSION. <br />4. AREAS TO RECEIVE FILL SHALL BE CLEARED OF ALL VEGETATION AND DELETERIOUS <br />MATTER. <br />5. AREAS TO RECEIVE FILL SHALL BE PROOFROLLED. ALL LOOSE AND SOFT AREAS SHALL BE <br />REMOVED AND REPLACED WITH STRUCTURAL FILL. <br />6, ALL FILL MATERIALS USED SHALL BE FREE OF VEGETATION AND DELETERIOUS MATTER <br />AND SHALL NOT CONTAIN ROCKS GREATER THAN SIX INCHES IN DIAMETER, <br />7. STRUCTURAL FILLS SHALL BE PLACED IN EIGHT TO 10 INCH THICK LOOSE HORIZONTAL <br />LIFTS AND SPREAD UNIFORMLY, <br />E. AFTER EACH LIFT HAS BEEN SPREAD EVENLY, IT SHALL BE COMPACTED TO A MINIMUM <br />OF 95% OF MAXIMUM DENSITY DETERMINED IN ACCORDANCE WITH ASTM D'1557 <br />(MODIFIED PROCTOR). <br />9. THE SURFACE OF ALL SLOPES SHALL BE COMPACTED. THIS MAY BE ACCOMPLISHED BY <br />OVER -BUILDING THE SLOPES, THEN CUTTING BACK TO FINAL GRADES, OR BY RUNNING <br />THE COMPACTOR OVER THE SLOPE AS EACH FILL LIFT IS BEING PLACED, ALL SLOPES <br />r <br />SHALL BE COMPACTED BY THE END OF EACH WORD DAY. <br />10. FIELD DENSITY TESTS (IF REQUIRED) WILL BE MADE BY A QUALIFIED SOILS ENGINEERING <br />FIRM. DENSITY TESTS SHALL BE TAKEN AT OR JUST BELOW THE SURFACE AT THE <br />FREQUENCY AND LOCATIONS DETERMINED BY THE SOILS ENGINEERING FIRM. WHEN THE <br />CT TESTS INDICATE THAT THE DENSITY OF ANY LAYER OF FILL OR PORTION THEREOF IS <br />BELOW THE SPECIFIED DENSITY, THE PARTICULAR SECTION SHALL BE REWORKED UNTIL <br />THE REQUIRED DENSITY HAS BEEN OBTAINED. ALL TEST RESULTS SHALL BE TRANSMITTED <br />TO THE CITY OF EVERETT BUILDING DEPARTMENT. <br />0 <br />11, A GRADING PERMIT AND APPROVAL OF THE TEMPORARY EROSION AND SEDIMENTATION <br />CONTROL PLAN SHALL HAVE BEEN OBTAINED FROM THE CITY OF EVERETT FOR ANY <br />ON -SITE GRADING. <br />0 12. ALL CUT AND FILL SLOPES SHALL BE A MAXIMUM OF 2.:1. <br />s 13. STOCKPILES ARE TO BE LOCATED IN SAFE AREAS AND ADEQUATELY PROTECTED TO PREVENT <br />EROSION. HYDROSEED PREFERRED. <br />_L. <br />14. NO GRADING SHALL OCCUR WITHIN 2 FEET OF PROPERTY BOUNDARY WITHOUT WRITTEN <br />APPROVAL OF ADJACENT OWNER. <br />L� <br />EXISTING GROUND COVER <br />o <br />0 <br />THE PREDOMINANT SOIL TYPE IS ALDERWOOD URBAN LAND COMPLEX GROUND COVER ON THE <br />MAJORITY OF THE SITE IS SECOND GROWTH FOREST WITH TYPICAL NATURE UNDERSTORY AT <br />FULL BUILDOUT THE SITE WILL HAVE A MAXIMUM IMPERVIOUS COVER OF 39%. THE REMAINDER <br />OF THE SITE WILL BE LANDSCAPING. <br />z <br />LIMITSCLEARING <br />a <br />CLEARING LIMITS SHOWN ON PLAN REPRESENT MAXIMUM ALLOWABLE EXTENT OF CLEARING ON <br />THE PROPERTY. OWNER MAY ELECT TO CLEAR LESS AREA WITHIN WSDOT RIGHT-OF-WAY. <br />DRAINAGE FACILITY DESIGN IS BASED ON ASSUMPTION OF MAXIMUM ALLOWED ONSITE <br />CLEARING AND HARDSCAPE. <br />MARKING OF CLEARING LIMITS AND PLACEMENT OF EROSION CONTROL BMPS IN THE FIELD <br />SHALL BE ADJUSTED FOR ACTUAL EXTENT OF CLEARING AS DIRECTED BY OWNER. CLEARING <br />_ LIMITS SHALL BE CLEARLY MARKED IN FIELD PRIOR TO COMMENCEMENT OF SITE WORK. <br />ALL POLLUTANTS, INCLUDING WASTE MATERIALS AND DEMOLITION DEBRIS, THAT OCCUR ONSITE <br />SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION <br />OF STORMWATER. GOOD HOUSEKEEPING AND PREVENTATIVE MEASURES WILL BE TAKEN TO <br />ENSURE THAT THE SITE WILL BE KEPT CLEAN, WELL ORGANIZED, AND FREE OF DEBRIS, IF <br />REQUIRED, BMPS TO BE IMPLEMENTED TO CONTROL SPECIFIC SOURCES OF POLLUTANTS ARE <br />DISCUSSED BELOW., <br />VEHICLES, CONSTRUCTION EQUIPMENT, AND/OR PETROLEUM PRODUCT STORAGE/DISPENSING: <br />ALL VEHICLES, EQUIPMENT, AND PETROLEUM PRODUCT STORAGE/DISPENSING <br />AREAS WILL BE INSPECTED REGULARLY TO DETECT ANY LEAKS OR SPILLS, AND TO <br />IDENTIFY MAINTENANCE NEEDS TO PREVENT LEAKS OR SPILLS. <br />Q ON -SITE FUELING TANKS AND PETROLEUM PRODUCT STORAGE CONTAINERS SHALL <br />INCLUDE SECONDARY CONTAINMENT. <br />0 SPILL PREVENTION MEASURES, SUCH AS DRIP PANS, WILL BE USED WHEN <br />CONDUCTING MAINTENANCE AND REPAIR OF VEHICLES OR EQUIPMENT, <br />0 IN ORDER TO PERFORM EMERGENCY REPAIRS ON SITE, TEMPORARY PLASTIC WILL BE <br />PLACED BENEATH AND, IF RAINING, OVER THE VEHICLE. <br />® CONTAMINATED SURFACES SHALL BE CLEANED IMMEDIATELY FOLLOWING ANY <br />DISCHARGE OR SPILL INCIDENT. <br />CHEMICAL STORAGE: <br />0 ANY CHEMICALS STORED IN THE CONSTRUCTION AREAS WILL CONFORM TO THE <br />APPROPRIATE SOURCE CONTROL BMPS LISTED IN VOLUME IV OF THE ECOLOGY <br />STORMWATER MANUAL. IN WESTERN WA, ALL CHEMICALS SHALL HAVE COVER, <br />CONTAINMENT, AND PROTECTION PROVIDED ON SITE, PER BMP C153 FOR MATERIAL <br />DELIVERY, STORAGE AND CONTAINMENT IN SWMMUUW 2005 <br />® APPLICATION OF AGRICULTURAL CHEMICALS, INCLUDING FERTILIZERS AND <br />PESTICIDES, SHALL BE CONDUCTED IN A MANNER AND AT APPLICATION RATES THAT <br />WILL NOT RESULT IN LOSS OF CHEMICAL TO STORMWATER RUNOFF. <br />MANUFACTURERS' RECOMMENDATIONS FOR APPLICATION PROCEDURES AND RATES <br />SHALL BE FOLLOWED. <br />DEMOLITION: <br />® DUST RELEASED FROM DEMOLISHED SIDEWALKS SHALL BE CONTROLLED USING <br />DUST CONTROL MEASURES (BMP C140). <br />® STORM DRAIN INLETS VULNERABLE TO STORMWATER DISCHARGE CARRYING DUST,. <br />SOIL, OR DEBRIS WILL BE PROTECTED USING STORM DRAIN INLET PROTECTION (BMP <br />C220 AS INDICATED ON THE PLAN). <br />® PROCESS WATER AND SLURRY RESULTING FROM SAWCUTTING AND SURFACING <br />OPERATIONS WILL BE PREVENTED FROM ENTERING THE WATERS OF THE STATE BY <br />IMPLEMENTING SAWCUTTING AND SURFACING POLLUTION PREVENTION MEASURES <br />(BMP C152), <br />1. SLURRY AND CUTTING SHALL BE VACUUMED DURING CUTTING AND SURFACING <br />OPERATIONS. <br />2. SLURRY AND CUTTINGS SHALL NOT DRAIN TO ANY NATURAL OR CONSTRUCTED <br />DRAINAGE CONVEYANCE, <br />3. COLLECTED SLURRY AND CUTTINGS SHALL BE DISPOSED OF IN A MANNER <br />THAT DOES NOT VIOLATE GROUNDWATER OR SURFACE WATER QUALITY <br />STANDARDS. <br />CONCRETE AND GROUT: <br />® PROCESS WATER AND SLURRY RESULTING FROM CONCRETE WORK WILL BE <br />PREVENTED FROM ENTERING THE WATERS OF THE STATE BY IMPLEMENTING <br />CONCRETE HANDLING MEASURES (BMP C151). <br />1. CONCRETE TRUCK CHUTES, PUMPS, AND INTERNALS SHALL BE WASHED OUT <br />ONLY INTO FORMED AREAS AWAITING INSTALLATION OF CONCRETE OR <br />ASPHALT, <br />2. UNUSED CONCRETE REMAINING IN THE TRUCK AND PUMP SHALL BE <br />RETURNED TO THE ORIGINATING BATCH PLANT FOR RECYCLING. <br />3. HAND TOOLS INCLUDING, BUT NOT LIMITED TO, SCREEDS, SHOVELS, RAKES, <br />FLOATS, AND TROWELS SHALL BE WASHED OFF ONLY INTO FORMED AREAS <br />AWAITING INSTALLATION OF CONCRETE OR ASPHALT. <br />WHEN NO FORMED AREAS ARE AVAILABLE, WASTWATER AND LEFTOVER PRODUCT <br />SHALL BE CONTAINED IN A LINED CONTAINER. CONTAINED CONCRETE SHALL BE <br />DISPOSED OF IN A MANNER THAT DOES NOT VIOLATE GROUNDWATER OR SURFACE <br />WATER QUALITY STANDARDS. <br />SANITARY WASTEWATER: <br />® PORTABLE SANITATION FACILITIES WILL BE. FIRMLY SECURED, REGULARLY <br />MAINTAINED, AND EMPTIED WHEN NECESSARY. <br />® SOLID WASTE WILL BE STORED IN SECURE, CLEARLY MARKED CONTAINERS. <br />OTHER: <br />OTHER BMPS WILL BE ADMINISTERED AS NECESSARY TO ADDRESS ANY ADDITIONAL <br />POLLUTANT SOURCES ON SITE. <br />:. <br />i l MI.. � � <br />BEFORE ANY CLEARING GRADING <br />TEMPORARY D MARKINGS AS FOLLOWS: <br />1. CLEARING LIMITS AS SHOWN ON OR t } BY OWNER (LIMITS ON PLAN <br />AREt• <br />FEET ABOVE GROUND. CONTRACTOR MAY SUBSTITUTE CONSTRUCTION SILT FENCING <br />FOR SURVEYOR'S .[ R <br />COMMENCING CLEARING OR GRADING. <br />SOIL <br />STOCKPILES <br />_AW <br />H .,. 4 <br />CONTROLill <br />�_ .■ + i r <br />EROSION <br />1=111,0+ al, ISM <br />laammiamol <br />EX. UNDERGROUND UTILITY LOCATIONS SHOWN HEREON ARE BASED UPON SURFACE <br />INDICATORS, NO UNDERGROUND LOCATE SERVICE WAS UTILIZED FOR THEIR LOCATION. THE <br />USE OF THIS MAP FOR THEIR EXACT LOCATION IS NOT WARRANTED. PRIOR TO CONSTRUCTION, <br />USER SHOULD CALL THE UTILITY LOCATE SERVICE AT 1-300-424-5555, TWO BUSINESS DAYS <br />BEFORE CONSTRUCTION, <br />M .AMi r_ h <br />�s <br />y <br />4 <br />..�,k, ri '` ti l `,3..... <br />ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE <br />MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR <br />INTENDED FUNCTION. FACILITIES SHALL BE INSPECTED AT A MINIMUM ON A WEEKLY BASIS AND <br />IMMEDIATELY AFTER ANY RUNOFF PRODUCING RAIN EVENT. ALL MAINTENANCE AND REPAIR <br />SHALL BE CONDUCTED IN ACCORDANCE WITH MARYSVILE STANDARDS, AT A MINIMUM, REPAIRS <br />TO BMP'S SHALL TAKE PRECEDENT OVER OTHER SITE WORK AND COMPLETED PRIOR TO <br />CLOSING THE SITE OF THE NIGHT. TRAPPED SEDIMENT MUST BE REMOVED OR STABILIZED ON <br />SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHOULD BE PERMANENTLY <br />STABILIZED. <br />HIGH VISIBILITY FENCING (BMP C103) <br />INSPECT FENCING AND REPAIR DAMAGED SECTIONS, <br />CONSTRUCTION ROAD STABILIZATION (BMP C107) <br />INSPECT STABILIZED AREAS REGULARLY, ESPECIALLY AFTER LARGE STORM EVENTS, ADD <br />GRAVEL IF NECESSARY AND RESTABILIZE ANY AREAS FOUND TO BE ERODING. <br />BMP C120, TEMPORARY SEEDING OF STRIPPED AREAS <br />SEEDING SHOULD BE SUPPLIED WITH ADEQUATE MOISTURE, SUPPLY WATER AS NEEDED, <br />ESPECIALLY !IN ABNORMALLY RIOT OR DRY WEATHER OR ON ADVERSE SITES. WATER APPLICATION <br />RATES SHOULD BE CONTROLLED TO PREVENT RUNOFF. <br />RE -SEEDING - AREAS WHICH FAIL TO ESTABLISH VEGETATIVE COVER ADEQUATE TO PREVENT <br />EROSION SHALL BE RE -SEEDED AS SOON AS SUCH AREAS ARE IDENTIFIED. <br />MULCHING (BMP C121) <br />MULCHED AREAS SHOULD BE CHECKED PERIODICALLY, ESPECIALLY FOLLOWING SEVERE <br />STORMS. DAMAGED AREAS OF MULCH OR TIE -DOWN MATERIAL SHALL BE IMMEDIATELY <br />REPAIRED. <br />PLASTIC COVERING (BMP C123) <br />CHECK REGULARLY FOR RIPS AND PLACES WHERE THE PLASTIC MAY BE DISLODGED, CONTACT <br />BETWEEN THE PLASTIC AND THE GROUND SHOULD ALWAYS BE MAINTAINED. ANY AIR BUBBLES <br />FOUND SHOULD BE REMOVED IMMEDIATELY OR THE PLASTIC MAY RIP DURING THE NEXT WINDY <br />PERIOD, RE -ANCHOR OR REPLACE THE PLASTIC AS NECESSARY, <br />TOPSOILING (BMP C125) <br />INSPECT FOR DAMAGE FROM RAINFALL AND SHEET FLOW. REGRADE AS NECESSARY. <br />DUST CONTROL (BMP C140) <br />RESPRAY AREA AS NECESSARY TO PREVENT WIND EROSION. <br />STORM DRAIN INLET PROTECTION (BMP C220) <br />FOR SYSTEMS USING FILTER FABRIC: INSPECTIONS SHOULD BE MADE ON A REGULAR BASIS, <br />ESPECIALLY AFTER LARGE STORM EVENTS. IF THE FILTER BAG BECOMES CLOGGED, IT SHOULD <br />BE CLEANED OR REPLACED. <br />SILT FENCE (BLIP C233) <br />INSPECT IMMEDIATELY AFTER EACH RAINFALL, AND AT LEAST DAILY DURING PROLONGED <br />RAINFALL, REPAIR AS NECESSARY. <br />SEDIMENT MUST BE REMOVED WHEN IT REACHES APPROXIMATELY ONE THIRD THE HEIGHT OF <br />THE FENCE, ESPECIALLY IF HEAVY RAINS ARE EXPECTED, <br />CONTRACTOR RESPONSIBILITY FOR <br />-EROSION/SILTATION CONTROL <br />SILTATIONIT IS THE INTENT OF THIS TEMPORARY EROSION AND O O PLAN THAT STORM <br />RUNOFF BE CONTROLLED AT ALL O .i O MAINTAIN WATER QUALITY, <br />ANY AND <br />ALL MEASURES NECESSARY TO <br />DO SO SHALL BE <br />EMPLOYED BY THE i +O <br />1. REGARDLESS SITE,O OTHER CONDI4 <br />RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON THE SITE D THAT POLLUTED <br />OR M. RUNOFF# OR ENTER INTO ANY CREEK, STREAM, WETLAND <br />OR WATER BODY ON OR OFF THE SITE. <br />2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN,THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR SELECTING AND IMPLEMENTING APPROPRIATE <br />'BEST MANAGEMENT <br />PRACTICES" (BMPs), FOR STORM WATER TREATMENT DCONTROLIREQUIREMENTS <br />ECOLOGYOF BOTH THE WASHINGTON STATE DEPARTMENT OF i <br />EROSION3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE <br />CERTIFIED D CONTROL D AND TO CITY OF EVERETT. IN THE <br />INSTALLEDEVENT THAT THE WATER QUALITY CONTROL MEASURES ARE INEFFECTIVE , <br />CONTROLLING EROSION ! SILTATION,!IMMEDIATELY REPORT TO AND <br />CONSULT WITH THE C.E.S.C.L. O FIND AN APPROPRIATEREMEDY. ALL CONSTRUCTION ACTIVITIES, <br />WITH THE EXCEPTION _ AND SILTATION <br />QUALITYTIME AS THE WATER D CITY OF EVERE 17 <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND <br />ANTICIPATING STORM ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN ANTICIPATION O: <br />FABRIC,THE WEATHER. <br />5ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPS SHALL BE STORED ON SITE <br />AND SHALL BE IMMEDIATELY AVAILABLE FOR USE. SUCH SUPPLIES AND MATERIALS SHALL INCLUDE, <br />BUT NOT BE LIMITED TO, STRAW BALES OR OTHER MULCHING MATERIAL, Slur FENCING AND STAKES, <br />FILTER <br />DURING AND CONTRACTOR MONITOR <br />PRIORITIZEEROSION CONTROL MEASURES AND SHALL t p MAINTENANCE OF <br />EROSION • <br />HIGH VISIBILITY FENCING (BMP C103) USE IN COMBINATION WITH BMP C233, SILT FENCE AS <br />INDICATED ON THE PLANS. <br />CONSTRUCTION ROAD/PARKING AREA STABILIZATION (BMP C107) <br />ONCE DEMOLITION IS COMPLETE, THE BUILDING FOUNDATIONS AND SLAB AREAS WILL BE <br />STABILIZED WITH GRAVEL AND CONCRETE. <br />TEMPORARY & PERMANENT SEEDING (BMP 3120) <br />PERMANENT SEEDING SHALL BE USED TO STABILIZE EXPOSED SOILS AND SHALL BE <br />PERFORMED UNDER THE DIRECTION OF THE LANDSCAPE PLANS AND SPECIFICATIONS. <br />MULCHING (BMP C`I21) <br />STABILIZE EXPOSED SURFACES WITH 4" STERILE STRAW MULCH WHEN SURFACES ARE TO <br />BE UNWORKED FOR THE SEASONAL TIME FRAMES LISTED IN THE TESC NOTES AND SWPPP <br />NARRATIVE. <br />PLASTIC COVERING (BMP C123) <br />USE PLASTIC SHEATHING TO PROTECT STOCKPILES, STABILIZE WITH SAND BAGS <br />CONNECTED WITH ROPE. <br />TOPSOILING/COMIPOSTING (BMP C125) TOPSOIL PROPOSED PLANTERS AND THE <br />BIO-RETENTION AS NOTED, <br />DUST CONTROL (BMP C140) <br />CONTRACTOR SHALL IMPLEMENT MEASURES TO PREVENT WIND TRANSPORT OF DUST <br />FROM SOIL SURFACES. SUCH MEASURES CAN INCLUDE BUT ARE NOT LIMITED TO THE <br />FOLLOWING: MULCHING AREAS NOT USED FOR VEHICLE ACCESS, REDUCING SPEEDS ON <br />HAUL ROADS, SPRINKLE EXPOSED SURFACES WITH WATER, SURFACE HAUL ROADS WITH <br />GRAVEL. <br />STORM INLET PROTECTION (BMP C220) PLACE INSERTS PER PLAN DETAIL IN EXISTING <br />CATCH BASINS AS INDICATED ON THE PLAN, <br />AS NEW CATCH BASINS ARE INSTALLED, THESE SHALL ALSO BE PROTECTED UNTIL THE <br />DRAINAGE AREA IS STABILIZED. <br />SILT FENCE (BMP C233) INSTALL SILT FENCE IN LOCATIONS INDICATED ON THE PLAN. <br />SEDIMENT TRAPPING 2" MIN. <br />AREA (TYP) 3" MAX. <br />---_ _.�_ 3/4"X3/4" WOODEN STAKE <br />21 <br />WATTLE TRENCH L <br />�Lu <br />uj <br />Li - <br />NOTE <br />1. INSTALL WATTLES SNUGLY INTO THE TRENCH. ABUT ADJACENT WATTLES TIGHTLY, <br />END TO END, WITHOUT OVERLAPPING THE ENDS, <br />2. LIVE STAKES MAY BE USED FOR PERMANENT INSTALLATIONS. <br />3. PILOT HOLES MAY BE DRIVEN THROUGH THE WATTLE AND INTO THE SOIL, WHEN <br />SOIL CONDITIONS REQUIRE, <br />4. WATTLES SHALL BE INSPECTED REGULARLY, AND IMMEDIATELY AFTER A RUNOFF <br />PRODUCING RAINFALL, TO ENSURE THEY REMAIN THOROUGHLY ENTRENCHED <br />AND IN CONTACT WITH THE SOIL. <br />5. PERFORM MAINTENANCE ON EROSION CONTROL DEVICES AS REQUIRED TO <br />MAINTAIN PROPER FUNCTIONALITY. REFER TO WSDOT M41-10 STANDARD <br />SPECIFICATIONS 3-01.3(15). <br />WATTLE DETAIL <br />NOT TO SCALE <br />PLAN APPROVED <br />pusuc <br />�E9°TN <br />WATER <br />A u Ls 'ACC k} stt � rs <br />3&et$1 x �� pr tFE sI r:n'63$s <br />a1da %r S v 1 It �t W4 THIS <br />rant TONAL PFR <br />w c�4 G GVfib� ra lISA� 15 A�§ta <br />..,,,, M,a„e� 3. <br />,/ { t cERMIOR cot"Asan . mM. <br />