My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD 2021-12-20
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD 2021-12-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 2:55:02 PM
Creation date
12/16/2021 7:24:35 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2018 WSEC Requirements for Commercial Buildin, eluding Group R2,R3&R4 over 3 stories&all R1 -- inistered by©2021 NEEA,All rights reserved <br /> The following information is necessary to check a permit application for compliance with the lighting systems,motors and electrical system requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> NA C408.1.2 Commissioning Include general summary of Cx plan per <br /> C408.1.2.1 requirements in C408.1.2 including:1)Narrative description <br /> C408.1.4 construction of activities;2)Responsibilities of the Cx <br /> C103.6.3 documents team;3)Schedule of activities including <br /> verification of project close out <br /> documentation per C103.6;4)Conflict of <br /> interest plan(if required) <br /> NA C4(}8.1.2 Commissioning Include in general summary that a Cx project <br /> C408.1.4 requirements in report and Compliance Checklist(Figure <br /> C103.6.3 construction C408,1.4.1)shall be completed by the <br /> documents Certified Cx Professional and provided to the <br /> owner prior to the final electrical inspection <br /> NA C408.4.1 Functional Identify in plans and specifications the <br /> performance testing intended operation of all equipment and <br /> criteria controls during all modes of operation, <br /> including interfacing between new and <br /> existing-to-remain systems <br /> PROJECT CLOSE OUT DOCUMENTATION <br /> NA C103.6.3 Project close out Indicate in plans that project close out <br /> documentation documentation is required including WSEC <br /> requirements lighting compliance reports that document all <br /> interior and exterior lighting area and/or <br /> surface types,lighting power allowances and <br /> installed densities <br /> If"no"is selected for any question,provide explanation. <br /> Page 10/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.