Laserfiche WebLink
• <br /> SNO ISLE BENCH OVEN <br /> UTILITY 12 MONTH PEAK DEMAND CALCULATION WORKSHEET <br /> PANEL MDB <br /> NEC 220.87 AND WAC 296-46B-900(3)(j) <br /> 12 Month Peak Demand (Month &Year) : March 2020 <br /> Phase to Phase Voltage (Volts) : 480 <br /> Phases (1=Single Phase, 3=Three Phase) : 3 <br /> Utility Peak Demand = 335.7 KW <br /> Power Factor / 0.90 (P.F.) <br /> Apparent Peak Demand = 373.00 KVA <br /> NEC 220.87(2)adjustment factor X 1.25 KVA <br /> Adjusted Peak Demand = 466.25 KVA <br /> Seasonal adjustment factor X 1.00 KVA <br /> Seasonal adjustment peak demand = 466.25 KVA <br /> Occupancy adjustment factor X 1.00 KVA <br /> Occupancy adjustment peak demand = 466.25 KVA <br /> Other adjustement factor(s) X 1.00 KVA <br /> Utility Peak Demand with Adjustments = 466.25 KVA <br /> New Calculated Demand Load Added BENCH OVEN + 7.50 KVA <br /> Metered Demand Based <br /> CALCULATED DEMAND LOAD : 473.75 KVA <br /> CALCULATED DEMAND CURRENT : 570 AMPS <br /> 8 <br /> 11 JUN 2 9 2021 <br /> CITY OF EVERETT <br /> Permit Services <br />