Laserfiche WebLink
SNO ISLE BENCH OVEN <br /> 30 DAY PEAK DEMAND CALCULATION WORKSHEET <br /> PANEL L <br /> NEC 220.87 AND WAC 296-46B-900(3)(j) <br /> 30-day demand study from : 4/14/2021 to 5/13/2021 <br /> Phase to Phase Voltage (Volts) : 480 <br /> Phases (1=Single Phase, 3=Three Phase) : 3 <br /> 30 Day Peak Demand On : 4/16/2021 = 133 Amps <br /> Apparent Peak Demand = 110.57 KVA <br /> NEC 220.87(2)adjustment factor X 1.25 KVA <br /> Adjusted Peak Demand = 138.22 KVA <br /> Seasonal adjustment factor X 1.00 KVA <br /> Seasonal adjustment peak demand = 138.22 KVA <br /> Occupancy adjustment factor X 1.00 KVA <br /> Occupancy adjustment peak demand = 138.22 KVA <br /> Other adjustement factor(s) X 1.25 KVA <br /> Measured Peak Demand with Adjustments = 172.77 KVA <br /> New Calculated Demand Load Added BENCH OVEN + 7.50 KVA <br /> Metered Demand Based <br /> CALCULATED DEMAND LOAD : 180.27 KVA <br /> CALCULATED DEMAND CURRENT : 217 AMPS <br />