My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3130 BROADWAY 2021-12-20
>
Address Records
>
BROADWAY
>
3130
>
3130 BROADWAY 2021-12-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 3:02:35 PM
Creation date
12/16/2021 7:51:31 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3130
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/28/2021 age 1?),___ <br /> 11:53:29A1vr City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. BW1806-003 Site Address 3130 BROADWAY <br /> Applied 6/21/2018 Applicant GREEN BUILT NORTHWEST LLC Lot <br /> Approved 12/4/2018 Owner BROADWAY STATION APARTMENTS LLC Block <br /> Issued 12/6/2018 Contractor GREEN BUILT NORTHWEST LLC Tract <br /> Parent Permit No. W1711-004 Description EXTERIOR AND INTERIOR REPAIRS AND ALTERATIONS <br /> Notes REPAIR W END OF BLDG,REBUILD BACK WALL,REPAIR/REPLACE DECK,RECONFIGURE <br /> STAIRS(1/31/2020 08:54 JEB)ADDED INTERIOR WORK TO DWELLING UNITS <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 1/11/2019 1/11/2019 BLDG DWF PARTIAL APPR Phone:206-274-9226 <br /> 03-FOUNDATION <br /> (1/11/2019 11:03 AM DWF) <br /> South side of building only 7 footings,ok <br /> for concrete. <br /> 1/16/2019 1/16/2019 BLDG DWF PARTIAL APPR Shear wall for west side of building <br /> 07-EXTERIOR Phone:206-274-9226 <br /> (1/16/2019 12:04 PM DWF) <br /> West end only,shear nailing. <br /> Partial approval,need to correct drainage <br /> issues. <br /> No wood to earth contact as per IBC. <br /> 1/16/2019 1/16/2019 BLDG DWF PARTIAL APPR Concrete footing rebar <br /> 02-FOOTING/SETB Phone:206-274-9226 <br /> (1/16/2019 12:01 PM DWF) <br /> 10 footings on North side/East end for <br /> balcony only. <br /> Ok for concrete. <br /> Note:need consultation for balance of <br /> work. <br /> 1/16/2019 1/16/2019 BLDG TMB CORRECTION See Notes (1/16/2019 2:59 PM TMB) <br /> 01-CONSULTATIO 1.Untreated lumber in close contact with <br /> soils,must use pressure treated lumber at <br /> these locations.SW portion of the 1st floor <br /> balcony and westterly portion of north <br /> ground floor balcony. <br /> 2.Please request a consultation to discuss <br /> the proposals to bring the balance of the <br /> structure into minimum code compliance. <br /> (observed numerous code concerns and <br /> violations.) <br /> 3.Remove soil from underfloor posts and <br /> piers,6"minimum clearance regd. <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.