Laserfiche WebLink
12/8/2021 Page 1 <br />City of Everett <br />2:32:56PM <br />INSPECTION ACTIVITY REPORT <br />Permit No. <br />C1702-002 <br />Site Address 4328 FOREST DR <br />Applied 2/3/2017 <br />Applicant <br />GILLILAND JEFF SE <br />Lot <br />Approved 4/6/2017 <br />Owner <br />LEE ROSE C REVOCABLE LIVING TRUST <br />Block <br />Issued 4/6/2017 <br />Contractor <br />ARMATA CONSTRUCTION SERVS LLC <br />Tract <br />Parent Permit No. <br />Description <br />REBUILD MAIN FLOOR WALLS & ROOF/PARTIAL 2ND FLR E <br />Notes <br />RETROFIT MAIN FLR AS REQUIRED/REMOVE EXIST CARPORT <br />FIRE DAMAGE REPAIR <br />(10/11/2017 10:20 AM CRB) <br />ADD PROPANE TANK TO SCOPE <br />NOT TO BE INSTALLED IN SETBACK <br />Scheduled <br />ComDleted <br />TVDe <br />Insuector Result <br />Remarks <br />Insuector's Comments <br />4/21/2017 <br />4/21/2017 <br />Footing <br />KMK PartialApproval <br />Ok to pour center <br />footing at stairs <br />4/24/2017 <br />12/24/2018 <br />Consultation <br />TMB Corr Reqd <br />See notes <br />Phone consultation with contractor about <br />the existing crumbling foundation <br />conditions. <br />Requesting removal and replacement of the <br />unsuitable existing concrete foundation or <br />specific on -site review and approval by the <br />engineer of record to proceed (written <br />report from engineer is required). <br />5/16/2017 <br />5/16/2017 <br />ShearNailing <br />DWF PartialApproval <br />Walls only - partial approval. <br />Note: To truss rafters at this time. <br />OK to side <br />Shear as per plans and revision. <br />10/10/2017 <br />10/10/2017 <br />P1bgRoughIn <br />SDP Approval <br />Permit not on site, <br />couldn't sign it <br />11/8/2017 <br />11/8/2017 <br />MechRefrig <br />SDP Approval <br />As noted <br />You are required to obtain a permit from the <br />fire department for the propane bottles. <br />Please have the permit on site for the <br />mechanical inspector at final inspection. <br />11/8/2017 <br />11/8/2017 <br />MechRoughIn <br />SDP Approval <br />As noted <br />You are required to obtain a permit from the <br />fire department for the propane bottles. <br />Please have the permit on site for the <br />mechanical inspector at final inspection. <br />12/15/2017 <br />12/15/2017 <br />BLDG FRAMING <br />DWF CORRECTION <br />Install seismic straps on cut outs over 50% <br />load bearing walls. <br />Install sloped seat hangers to stair stringers <br />per 1/12 detail. <br />Note: No records of exterior shear nailing <br />inspection? <br />12/15/2017 <br />12/15/2017 <br />BLDG INTERIOR <br />DWF APPROVAL <br />No record of exterior <br />SHEAR <br />shear nailing? <br />12/22/2017 <br />12/22/2017 <br />BLDG FRAMING <br />DWF APPROVAL <br />See notes <br />Ok to cover with drywall. <br />Note: Provide a copy of insulation <br />certificate and blower door test at building <br />final. <br />12/22/2017 <br />12/22/2017 <br />BLDG <br />DWF APPROVAL <br />See notes <br />Ok to cover with drywall. <br />INSULATION <br />Note: Provide a copy of insulation <br />certificate and blower door test at building <br />final. <br />1/16/2018 <br />1/16/2018 <br />BLDG <br />DWF APPROVAL <br />OK to cover <br />09-DRYWALL <br />6/26/2018 <br />6/26/2018 <br />PLUMB <br />SDP APPROVAL <br />03-ROUGH IN <br />8/15/2018 <br />8/15/2018 <br />PLUMB <br />SDP CORRECTION <br />1. Shower threshold/entry must have a <br />01-CONSULTATIO <br />minimum of 22" clear space. <br />2. Anchor heat pump and pad to prevent <br />horizontal displacement. <br />3. Strap propane tanks to prevent horizontal <br />displacement. <br />9/21/2018 <br />9/21/2018 <br />BLDG <br />DWF OTHER <br />See notes for <br />Install handrailing as per IRC <br />08-FRAMING <br />consultation <br />And landing to stairway <br />Secure ledger lan/sds screws roof west <br />INSPl2 <br />I r�SYSTrEMS <br />