Laserfiche WebLink
• <br /> ti <br /> 5. On Sheet 3, it is unclear what the lines between the elevated deck/floor and the top of the <br /> handrail/guardrail system are intended to be. If these are intended to provide opening <br /> limitations, please provide a configuration that demonstrates compliance with the minimum <br /> dimensions and materials. Please clarify as there do not appear to be callouts describing its <br /> construction. <br /> A view and section of the post and guardrails has been added to PAGE 4 showing compliance. <br /> My apologies for the"mixed media." I am away from Everett,where I've left the originals.There are <br /> some difficulties in combining scans and drawing tools. <br /> Attached are two copies of five documents: <br /> • This letter <br /> • Reference photos of the job site (letter size) <br /> • Site Plan: Sheet 1 (ledger size) <br /> • Existing Structure: Sheet 2 (ledger size) <br /> • Framing: Sheet 3 (ledger size) <br /> • Details: Sheet 4 (letter size) <br /> Thank you very much, <br /> Walter Knowles <br /> Owner and President of the Clough Condo Association <br /> 1010 Hoyt Ave- B2008-013 10/23/20 n 2 / <br />