Laserfiche WebLink
• I <br /> b. Noise <br /> 1) What types of noise exist in the area which may affect your project(for <br /> example: traffic,equipment,operation, other)? <br /> There is no noise that is currently known in the area that may affect the Project. <br /> 2) What types and levels of noise would be created by or associated with the <br /> project on a short-term or a long-term basis(for example: traffic,construction, <br /> operation,other)?Indicate what hours noise would come from the site. <br /> Short-term increases in noise may occur from equipment used for restoration activities. <br /> Work will take place during daytime hours. Long-term noise levels at the site would remain <br /> similar to existing levels after Project completion. <br /> 3) Proposed measures to reduce or control noise impacts, if any: <br /> Construction activities will be performed in accordance with City of Everett Municipal Code <br /> Chapter 20.08 for Noise Control or approved exceptions. <br /> 8. Land and Shoreline Use 'help] <br /> a. What is the current use of the site and adjacent properties?Will the proposal <br /> affect current land uses on nearby or adjacent properties?If so,describe. <br /> The property is currently used as farmland for blueberry production.The Project area <br /> is bounded by similar agricultural properties.The City of Everett owns the vacant land <br /> to the north that appears to be used for pasture or hay, and land to the south is <br /> currently used as farmland and pasture. Puget Sound Energy owns an electric utility <br /> line that passes through an existing easement at the property, and Bonneville Power <br /> Administration also owns electric utility lines near the southeast portion of the Project <br /> area. The Project is not expected to affect current land uses on nearby or adjacent <br /> properties. <br /> b. Has the project site been used as working farmlands or working forest lands? If <br /> so, describe.How much agricultural or forest land of long-term commercial <br /> significance will be converted to other uses as a result of the proposal, if any? If <br /> resource lands have not been designated,how many acres in farmland orforest <br /> land tax status will be converted to nonfarm or nonforest use? <br /> The property has been and is currently used as working farmland.The property was <br /> purchased by Golden Eagle Farms in 2013,and blueberry plants were planted in late <br /> 2018. No agricultural or forest land of long-term commercial significance will be <br /> converted to other uses as a result of the Project. <br /> 1) Will the proposal affect or be affected by surrounding working farm orforest <br /> land normal business operations,such as oversize equipment access,the <br /> application of pesticides,tilling,and harvesting?If so,how: <br /> The Project will not affect or be affected by surrounding working farm or forest lands. <br /> c. Describe any structures on the site. <br /> There are two small standing structures on the property(a shed and a roofed shelter). <br /> d. Will any structures be demolished? If so,what? <br /> No structures will be demolished as part of the Project. <br /> 12 <br />