My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7401 LARIMER RD 2021-12-21
>
Address Records
>
LARIMER RD
>
7401
>
7401 LARIMER RD 2021-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2021 11:53:15 AM
Creation date
12/17/2021 11:51:12 AM
Metadata
Fields
Template:
Address Document
Street Name
LARIMER RD
Street Number
7401
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> e. What is the current zoning classification of the site? <br /> The site is currently zoned A-1 Agriculture(City of Everett 2020). <br /> f. What is the current comprehensive plan designation of the site? <br /> The City of Everetts current Comprehensive Plan designation of the site is Resource <br /> Lands(City of Everett2019a). <br /> g. If applicable,what is the current shoreline master program designation of the <br /> site? <br /> The entire property is located within a City of Everett Shoreline Master Program <br /> shoreline environment designated as Urban Conservancy Agriculture <br /> (City of Everett 2019b). <br /> h. Has any part of the site been classified as a critical area by the city or county? If <br /> so,specify. <br /> The City of Everett identifies the following critical areas within the Project area: <br /> • "Type S"streams(City of Everett 2013) <br /> • Moderate to high liquefaction susceptibility(Palmer et al. 2004) <br /> • FEMA Special Development Area <br /> i. Approximately how many people would reside or work in the completed project? <br /> No people would reside in the completed Project area.The completed Project will not affect the <br /> number of people working within the Project area. <br /> j. Approximately how many people would the completed project displace? <br /> No people will be displaced by the completed Project. <br /> k. Proposed measures to avoid or reduce displacement impacts, if any: <br /> No people will be displaced by the completed Project;therefore, no measures to avoid or <br /> minimize displacement impacts are proposed. <br /> I. Proposed measures to ensure the proposal is compatible with existing and <br /> projected land uses and plans,if any: <br /> The Project will result in the continued use of the property for agriculture,which is compatible <br /> with current and projected land uses and plans. <br /> m. Proposed measures to reduce or control impacts to agricultural and forest lands <br /> of long-term commercial significance, if any: <br /> The Project will not impact the continued existence of agricultural or forest lands;therefore, no <br /> measures are proposed. <br /> 9. Housing Jhelpl <br /> a. Approximately how many units would be provided,if any? Indicate whether high, <br /> middle,or low-income housing. <br /> No housing units will be provided by the Project. <br /> b. Approximately how many units,if any,would be eliminated?Indicate whether <br /> high, middle,or low-income housing. <br /> No housing units will be eliminated by the Project. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.