Laserfiche WebLink
• <br /> April 10, 2020 <br /> Page 8 <br /> Contingency plans shall be submitted by December 1 of the year in which deficiencies are <br /> discovered.A contingency plan, if required,will be submitted to USACE and the City of Everett before <br /> contingency activities are implemented. <br /> Table 2 <br /> Potential Contingency Actions for the Site <br /> Monitoring Interim Performance <br /> Design Feature Year(s) Standards Contingency Action <br /> Re-evaluate the suitability of the plant species for <br /> Native upland woody <br /> vegetation species <br /> site conditions and re-establish,if necessary. <br /> 1 and 2 survivorship is monitored Consider species makeup and, if functioning, do <br /> at 90% nothing.Consider use of alternate species. <br /> Riparian Buffer Undertake additional monitoring. <br /> Communities Re-evaluate the suitability of the plant species for <br /> Native upland woody <br /> vegetation species <br /> site conditions and re-establish,if necessary. <br /> 5 survivorship is monitored Consider species makeup and, if functioning, do <br /> at 75% nothing.Consider use of alternate species. <br /> Undertake additional monitoring. <br /> Side slopes are Re-evaluate the suitability of the soil material <br /> maintained at the design <br /> Slope Stability 1, 2,and 5 slope without any areas of and slope and determine the cause of failure. If <br /> necessary,cut the slopes back further. <br /> sloughing <br /> Limitations <br /> This report was prepared for Golden Eagle Farms for use in documenting design analysis for the <br /> design of the Project. Conditions within the Project may change both spatially and with time and as <br /> additional scientific and engineering data may become available. Significant changes in Project area <br /> conditions or the available information may require reassessment of both existing and proposed <br /> Project conditions. Within the limitations of scope,schedule, and budget,the services of Anchor QEA, <br /> LLC, have been executed in accordance with generally accepted scientific and engineering practices <br /> in this area at the time this report was prepared. <br />