My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2902 RUCKER AVE FAST SIGNS 2021-12-17
>
Address Records
>
RUCKER AVE
>
2902
>
FAST SIGNS
>
2902 RUCKER AVE FAST SIGNS 2021-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2021 3:40:37 PM
Creation date
12/17/2021 3:40:09 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2902
Tenant Name
FAST SIGNS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/16/2021 City of Everett Page i <br /> 11:42:59AM, ,. <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. M2011-084 Site Address 2902 RUCKER AVE <br /> Applied 11/19/2020 Applicant TIM IRVINE Lot <br /> Approved 1/19/2021 Owner DMT RUCKER LLC Block <br /> Issued 2/5/2021 Contractor OCEANVIEW CONSTRUCTION GRP LLC Tract <br /> Parent Permit No. B2010-013 Description REPL EXTG ROOFTOP UNITS <br /> Notes **RTU'S SHOULD BE NON-REFLECTIVE AND/OR PAINTED TO BLEND IN WITH EXISTING <br /> BUILDING WHEREVER FEASIBLE** <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 3/10/2021 3/10/2021 MECH 05-OTHER SDP OTHER discription of work (3/30/2021 9:59 AM SDP) <br /> this permit This permit covers the new rooftop units, <br /> gas pipe and the 1st floor HVAC remodel. <br /> 3/11/2021 3/11/2021 GAS 01-ROUGH IN TAHU APPROVAL eTRAKiT Inspection 3/10/2021 2:59 PM Bryan Cooley <br /> Request <br /> Contact Name:Bryan Cooley <br /> Site Address:2902 RUCKER AVE <br /> Phone:4252469180 <br /> e-Mail:bcooley@csusanw.com <br /> (3/11/2021 2:32 PM TAHU) <br /> note,This is for the TI in the buillding,the <br /> gas line is running up the side of the <br /> building to the roof top units,RTU 2,3,ok <br /> for rough in <br /> call in for the gas final when ready <br /> Note,gas meter and RTU's <br /> 3/17/2021 3/29/2021 MECH 04-ROUGH TAHU PARTIALAPPR eTRAKiT Inspection 3/16/2021 11:32 AM Bryan Cooley <br /> IN Request <br /> Contact Name:Bryan Cooley <br /> Site Address:2902 RUCKER AVE <br /> Phone:4252469180 <br /> e-Mail:bcooley@csusanw.com <br /> (3/29/2021 7:36 AM SDP) <br /> (3/17/2021 12:17 PM TAHU) <br /> This inspection takes care of all of HVAC <br /> in the ceiling in level one, and up to the <br /> roof top units on the roof. <br /> note all duct work is exposed in the ceiling. <br /> 3/17/2021 3/17/2021 GAS 03-FINAL TAHU NOT READY eTRAKiT Inspection 3/16/2021 11:31 AM Bryan Cooley <br /> Request <br /> Contact Name:Bryan Cooley <br /> Site Address:2902 RUCKER AVE <br /> Phone:4252469180 <br /> e-Mail:bcooley@csusanw.com <br /> (3/29/2021 3:25 PM TAHU) <br /> Call in for final when RTU's are ready and <br /> meter is set. <br /> INSP12 <br /> Rl Ws ° TEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.