Laserfiche WebLink
4/16/2021 age 2 <br /> A <br /> City of Everett <br /> 11:42:59AM <br /> INSPECTION ACTIVITY REPORT <br /> 3/29/2021 3/29/2021 MECH 04-ROUGH TAHU APPROVAL eTRAKiT Inspection 3/24/2021 3:57 PM Zack McGinnis <br /> IN Request Ceiling cover <br /> Contact Name:Zack McGinnis <br /> Site Address:2902 RUCKER AVE <br /> Phone:4254718115 <br /> e-Mail:Zmcginnis@csusanw.com <br /> (3/29/2021 3:13 PM TAHU) <br /> above the bathroom ceilling and the duct <br /> wok under the stairwell ok <br /> 4/5/2021 4/5/2021 MECH 06-FINAL TAHU APPROVAL eTRAKiT Inspection 4/1/2021 9:42 AM Zack McGinnis <br /> Request 1st floor TI final inspection <br /> Contact Name:Zack McGinnis <br /> Site Address:2902 RUCKER AVE <br /> Phone:4254718115 <br /> e-Mail:Zmcginnis@csusanw.com <br /> (4/5/2021 12:33 PM TAHU) <br /> HVAC ok for the TI <br /> 4/13/2021 4/13/2021 MECH 06-FINAL TAHU APPROVAL eTRAKiT Inspection 4/12/2021 10:11 AM Tim Irvin <br /> Request ASKED FOR BUILDING TI FINAL ON <br /> B2010-013 and was told Need to confirm <br /> gas was approved,for first floor noted first <br /> floor signed off <br /> Contact Name:Tim Irvin <br /> Site Address:2902 RUCKER AVE <br /> Phone:3603178125 <br /> e-Mail:ocg.11c@yahoo.com <br /> 4/13/2021 4/13/2021 GAS 03-FINAL TAHU APPROVAL eTRAKiT Inspection 4/12/2021 2:48 PM Tim Irvin <br /> Request I thought this was done already, <br /> Contact Name:Tim Irvin <br /> Site Address:2902 RUCKER AVE <br /> Phone:3603178125 <br /> e-Mail:ocg.1lc@yahoo.com <br /> (4/13/2021 3:27 PM TAHU) <br /> Final is ok <br /> INSP12 <br />