Laserfiche WebLink
• • <br /> Dean Dariotis, AIA <br /> Dariotis Developments, Inca <br /> 17389 Hulbert Rd. <br /> Mt. Vernon, WA 98273 <br /> (425) 772-3167 <br /> Fahim Siddiq <br /> City of Everett <br /> Project Planner <br /> 2930 Wetmore Ave., Suite 100 <br /> Everett, WA 98201 <br /> RE: SEPA APPLICATION, 903 W. CASINO RD, PERMIT#188766 <br /> 11 July 2006 <br /> Dear Mr. Siddiq; <br /> In order for the City of Everett to properly assess our recent application for a SEPA <br /> review I would like to offer the following: <br /> CLEARING/GRADING PERMIT <br /> In June 10, 1996 Dariotis Developments Inc. applied for a clearing and grading permit. <br /> This application was determined to be complete by Don Wood on June 27, 1996.(e,A,A <br /> proposed mitigated determination-of non-significance, SEPA#34-96 was applied for,„ <br /> and a final mitigated determination of non-significance was issued on June 28, 1996.(re,E, <br /> A site plan was drawn up to obtain a public works permit, using a survey from Lovell- <br /> Sauerland&Associates, Inc. prepared on June 25, 1991,(refD,which showed the wetland <br /> area and the 25' buffer as accepted by Mr. Stephen Stanley, City of Everett, in a <br /> memorandum dated May 17, 1996.<«f.E,This site plan was approved by the city on <br /> September 8, 1996.(rcf.F,The site was posted and the affidavit of posting was notarized on <br /> July 3, 1996.(refG, <br /> A permit, #96-379,(,was issued on September 8, 1996. Work was commenced shortly <br /> thereafter,the site was cleared and graded and the work was completed according to the <br /> conditions on the permit. <br /> CONSTRUCTION TRAILER PERMIT <br /> On March 15, 1999 a permit was issued to Dariotis Construction Co. to place a <br /> construction trailer on the property at 903 W. Casino Rd.,permit#C61738.<«fI,This <br /> permit was based on a site plan which was based on the Lovell-Sauerland &Associates, <br /> Inc. survey from June 25, 1991. This site plan was approved on March 2, 1999��f n and <br /> shows the location of the construction trailer with a 20' side yard setback, and the 25' <br /> buffer around the wetland. <br /> l�� <br />