My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1910 W MUKILTEO BLVD Geotech Report 2022-10-25
>
Address Records
>
W MUKILTEO BLVD
>
1910
>
Geotech Report
>
1910 W MUKILTEO BLVD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:57:31 PM
Creation date
12/22/2021 11:24:06 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
1910
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering'Evaln • NGA File No.1238721 <br /> Spencer Garage Addition February 11,2021 <br /> Everett,Washington Page 10 <br /> Slab-on-Grade <br /> Slabs-on-grade should be supported on subgrade soils prepared as described`inthe Site Preparation and <br /> Grading subsection of this report.We recommend that all floor slabs be underlain by at least six inches <br /> of free-draining gravel with less than three percent by weight of the material passing Sieve#200 for use <br /> as a capillary break. A suitable vapor barrier, such as heavy plastic sheeting(6-mil, minimum), should be <br /> placed over the capillary break material. An additional 2-inch-thick moist sand layer may be used to <br /> cover the vapor barrier.This sand layer may be used to protect the vapor barrier membrane and to aid <br /> in curing the concrete. <br /> Pavements <br /> Pavement subgrade preparation and structural filling where required, should be completed as <br /> recommended in the Site Preparation and Grading and Structural Fill subsections of this report. The <br /> pavement subgrade should be proof-rolled with a heavy, rubber tired piece of equipment, to identify <br /> soft or yielding areas that require repair. The pavement section should be underlain by a stable <br /> subgrade. We should be retained to observe the proof-rolling and recommend repairs prior to <br /> placement of the asphalt or hard surfaces. <br /> Utilities <br /> We recommend that underground utilities be bedded with a minimum six inches of pea gravel prior to <br /> backfilling the trench with on-site or imported material. Trenches within settlement sensitive areas <br /> should be compacted to 95 percent of the modified proctor as described in the Structural Fill subsection <br /> of this report. Trenches located in non-structural areas should be compacted to a minimum 90 percent <br /> of the maximum dry density.The trench backfill compaction should be tested. <br /> Site Drainage <br /> Infiltration:We intended to conduct a Small PIT in accordance with the 2014 Stormwater Management <br /> Manual for Western Washington (2014 SWMMWW) within Infiltration Test Pit One located within the <br /> southeastern portion of the site as shown on the attached Site Plan in Figure 2. The test was deemed <br /> infeasible when moderate ground water seepage was encountered at 4.0-feet filling the pit with several <br /> inches of. water. Test pit caving was encountered at 5.0-feet. Infiltration Test Pit One measured <br /> approximately 4.0-feet long by 2.0-feet wide by 6.5-feet deep. <br /> Due to the presence of groundwater seepage within all of our explorations, and the silty, dense nature <br /> of the subsurface soils, it is our opinion that stormwater infiltration is infeasible within this site. All <br /> runoff generated on this site, including roof downspouts, yard and footing drains, and hard surfaces, <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.