My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5001 SOUND AVE 2022-05-13
>
Address Records
>
SOUND AVE
>
5001
>
5001 SOUND AVE 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 10:59:56 AM
Creation date
12/23/2021 8:07:09 AM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR #2 Construction Stormwater Pollution Prevention <br /> (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters. A Construction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br /> management concerns.A copy of this SWPPP is required to be kept by the contractor performing the work at <br /> the jobsite for reference and updated during the duration of construction. <br /> Task 1: Describe the project during construction <br /> (You may attach a narrative that answers the following questions) <br /> Nature and purpose of the construction project: <br /> The proposed project will subdivide the existing parcel into two lots and provide <br /> frontage improvements. Lot#1, to the north, will have a new house and driveway. Lot <br /> #2 will have the existing house and a new attached garage. <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that might be <br /> affected by the construction project: <br /> Sound Ave <br /> How upstream drainage areas may affect the site: <br /> Upstream flows will not affect the project site as the immediate upstream area is <br /> developed and will not be disturbed. The area has a french drain system that will <br /> manage any upstream flows. <br /> Downstream drainage leading from the site to a receiving body of water: <br /> The site contains one drainage basin that slopes moderately to the north west. The <br /> runoff from the site flows to the north west and enters the existing drainage system <br /> along Sound Ave for about 185 ft before turning to the west for about 1,570 ft along W <br /> Mukilteo Blvd. The flows then turn to the north for about 150 ft before enterina a hiahlvill <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> N/A <br /> Special requirements and provisions for working near or within critical areas: <br /> N/A <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.