My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5001 SOUND AVE 2022-05-13
>
Address Records
>
SOUND AVE
>
5001
>
5001 SOUND AVE 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 10:59:56 AM
Creation date
12/23/2021 8:07:09 AM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Areas on the site that have potential erosion problems: <br /> N/A <br /> Locations where surface water leaves the site: <br /> Surface water leaves the site along the frontage to Sound Ave. <br /> Task 2: Select Construction Best Management Practices (BMPs)to be used on your project <br /> All new development and redevelopment projects are responsible for preventing erosion and sedimentation <br /> during construction.Each of the 13 requirements below contains a list of Best Management Practices(BMPs) <br /> that are accepted by the Washington State Department of Ecology(Ecology)for satisfying each requirement. <br /> The BMPs below are the most common. For a complete selection of BMPs please see Volume II of Ecology's <br /> Stormwater Management Manual for Western Washington. <br /> 0 Each of the 13 Elements below must be considered in the SWPPP.Select all <br /> BMPs that you will be using to satisfy each requirement.All requirements must <br /> have at least one item selected. <br /> Element 1. Preserve vegetation/mark clearing limits: <br /> ❑ BMP C101:Preserving Natural Vegetation <br /> ❑ BMP C102:Buffer Zones <br /> In BMP C103:High Visibility Plastic or Metal Fence <br /> ❑ Other Per the SWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 2. Establish construction: <br /> IN BMP C105:Stabilized Construction Entrance/Exit <br /> ❑ BMP C106:Wheel Wash <br /> ❑ BMP C107:Construction Road/Parking Area Stabilization <br /> ❑ Other Per the SWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.