Laserfiche WebLink
• <br /> Element 3. Control flow rates: <br /> ❑ BMP C203:Water Bars <br /> ❑ BMP C240:Sediment Trap <br /> ❑ BMP C241:Temporary Sediment Pond <br /> ❑ Other Per the SWMMWW: <br /> PI Not applicable to my proposed project <br /> Explain: Flow is minimal <br /> Element 4. Install sediment controls: <br /> ❑ BMP C231:Brush Barrier <br /> ❑ BMP C232:Gravel Filter Berm <br /> a BMP C233:Silt Fence <br /> ❑ BMP C234:Vegetated Strip <br /> ❑ BMP C235:Wattles <br /> ❑ BMP C240:Sediment Trap <br /> ❑ BMP C241:Temporary Sediment Pond <br /> ❑ Other Per the SWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 5. Stabilize soils: <br /> a BMP C120:Temporary and Permanent Seeding <br /> ▪ BMP C121:Mulching <br /> ❑ BMP C122:Nets and Blankets <br /> e BMP C123:Plastic Covering <br /> ❑ BMP C124:Sodding <br /> ❑ BMP C125:Topsoiling/Composting <br /> ❑ BMP C126:Polyacrylamide for Soil Erosion Protection <br /> ❑ BMP C130:Surface Roughening <br /> ❑ BMP C131:Gradient Terraces <br /> ❑ Other Per the SWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Storm water Site Plan Report-Dec 2019 9 <br />