Laserfiche WebLink
TABLE OF CONTENTS <br /> Section 1 Project Overview 1 <br /> Section 2 Application of Minimum Requirements 3 <br /> 2.1 Minimum Requirements 3 <br /> 2.1.1 Minimum Requirement#1: Preparation of Stormwater Site Plans 3 <br /> 2.1.2 Minimum Requirement#2: Construction Stormwater Pollution Prevention (SWPP) 3 <br /> 2.1.3 Minimum Requirement#3: Source Control of Pollution 3 <br /> 2.1.4 Minimum Requirement#4: Preservation of Natural Drainage Systems and Outfalls 3 <br /> 2.1.5 Minimum Requirement#5: On-site Stormwater Management 3 <br /> Section 3 Proposed Stormwater Work 3 <br /> Appendix A—DOE Flow Chart for Redevelopment <br /> Appendix B—Site Plans <br /> Appendix C—Soils Information <br /> 2022.13958.06 Page i Everett Costco ADA Improvements TIR <br />