My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE 2021-12-23
>
Address Records
>
19TH AVE SE
>
10200
>
10200 19TH AVE SE 2021-12-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2021 11:38:05 AM
Creation date
12/23/2021 11:36:16 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> SECTION 1 <br /> PROJECT OVERVIEW <br /> This Technical Information Report(TIR) has been prepared for the Everett Costco ADA Improvements <br /> Project in Everett,Washington. A Site Location Map is presented in Figure 1. This report describes how <br /> the project's site improvements comply with sections of the Everett Municipal Code regulating <br /> stormwater and drainage. This project will adhere to City of Everett Stormwater Code and the <br /> Department of Ecology Stormwater Manual for Western Washington. <br /> The existing warehouse is located at 10200 19th Ave SE, Everett,WA. The existing site is entirely <br /> developed and includes the warehouse building,gas station facility, parking lots, landscape areas,and <br /> driveways for internal traffic circulation. <br /> This project consists of the removal and replacement of selected areas of sidewalks and parking stalls <br /> within the site that are out of compliance with ADA regulations. The area to be replaced is <br /> approximately 10,996 sf. Construction will impact approximately 0.3 acres of the 20.1-acre site. <br /> The project will include the construction of the following elements: <br /> • Minor sidewalk regrading <br /> • Sidewalk ramp reconstruction <br /> • Construction of raised crosswalks <br /> • Minor parking lot regrading with paving within ADA stalls <br /> Predeveloped Conditions <br /> The existing area proposed for parking lot and sidewalk reconstruction consists of asphalt and concrete <br /> pavement and is currently used for parking and walkways. Stormwater at the project site is collected by <br /> catch basins and conveyed to detention basins onsite.Water quality treatment and flow control are <br /> provided on site. <br /> A soils information report(See Appendix C) is provided for the project and identifies the soil at the site <br /> as Alderwood-Urban land complex. <br /> Developed Conditions <br /> Minor parking lot regrading will be completed near the northeast corner of the warehouse to provide <br /> ADA compliant parking stalls and walkways. No new impervious surface will be created by the project. <br /> The existing storm drain system will not be modified and the existing runoff patterns for the site will be <br /> maintained. <br /> 2022.13958.06 Page 1 Everett Costco ADA Improvements TIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.