My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/12/22 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/12/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 3:02:01 PM
Creation date
12/23/2021 12:03:06 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/22/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`EVERETT <br />City Council Agenda Item Cover Sheet <br />A Professional Service Agreement with KPFF Consulting Engineers to Provide Engineering <br />Project title: Services for the Later Phase Eclipse Mill Park Project and Riverfront Trail Improvement Project <br />in an Amount Not to Exceed $600,000.00 <br />Council Bill # <br />Agenda dates requested: <br />Briefing <br />Proposed action <br />Consent <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />12/22/2021 <br />X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Professional Services <br />Agreement <br />Department(s) involved: <br />Parks and Facilities <br />Administration <br />Legal <br />Contact person: <br />Bob Leonard <br />Phone number: <br />425-257-8335 <br />Email: <br />bleonard@everettwa.gov <br />Initialed by: <br />2.ML <br />Department head <br />Administration <br />Council President <br />Project: Later Phase Eclipse Mill Park & Riverfront Trail Improvement Project <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Fund: <br />KPFF Consulting Engineers <br />Riverfront Development Area <br />Funding Ordinance — 12/8/2021 <br />Fund 354, Program 073 (CIP-4) <br />Fiscal summary statement: <br />The proposed Professional Service Agreement with KPFF Consulting Engineers is for <br />professional engineering and related services for the Later Phase Eclipse Mill Park and <br />Riverfront Trail Improvement Project. The amount of the contract is $600,000 which <br />includes a design contingency. <br />A funding ordinance for the Later Phase Eclipse Mill Park & Riverfront Trail Improvement <br />Project was approved by Council on December 8, 2021. <br />The source of funds is CIP 4. The Later Phase Eclipse Mill Park and Riverfront Trail <br />Improvement Project is an identified project in the CIP-4 funding model. <br />Project summary statement: <br />KPFF Consulting Engineers was selected to provide engineering and related services for <br />the Later Phase Eclipse Mill Park and Riverfront Trail Improvement Project through the <br />Standard Procurement Policy formal Request for Qualification process. <br />The engineering work on the Eclipse Mill Park will include stabilization of the Snohomish <br />riverbank, a personal watercraft floating boarding dock, and access trail in the lowland <br />park area. <br />The engineering work on the Riverfront Trail will include relocating a portion of the <br />existing trail that is being washed out by the Snohomish River and repairs to the trail <br />due to tree root issues. <br />The scope of work includes preparation of preliminary design, construction documents, <br />estimating, bidding, and construction administration services. <br />Construction of the Later Phase Eclipse Mill Park and the Riverfront Trail Improvements <br />is anticipated to begin in 2024/2025. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign a Professional Service Agreement with KPFF Consulting <br />Engineers to provide engineering services for the Later Phase Eclipse Mill Park and <br />Riverfront Trail Improvement Project in an amount not to exceed $600,000.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.