My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12011 19TH AVE SE PARKING LOT 2021-12-23
>
Address Records
>
19TH AVE SE
>
12011
>
PARKING LOT
>
12011 19TH AVE SE PARKING LOT 2021-12-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2021 12:09:10 PM
Creation date
12/23/2021 12:07:51 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12011
Tenant Name
PARKING LOT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER SITE PLAN OCTOBER 23,2019 <br /> EMORYS ON SILVER LAKE PAGE 2 <br /> MR 1: PREPARATION OF STORMWATER SITE PLANS <br /> DRAINAGE PLAN DESCRIPTION <br /> Direct precipitation is the source of runoff. The paved area runoff will flow to the west end of <br /> the parking lot, be collected in a catchbasin, then discharged to a combined detention/ <br /> stormwater wetland pond for treatment and runoff control. A catch basin will also be installed <br /> in 120th Place SE to collect runoff from a portion of the existing street fronatage, the new <br /> sidewalk and planter areas. <br /> WATER QUALITY MEASURES <br /> Following is a list of the possible construction water quality BMPs. See MR 3: Water Pollution <br /> Source Control for more information.The BMPs are as follows: <br /> BMP C103, High Visibility Fence <br /> BMP C105, Stablized Construction Entrance/Exit <br /> BMP C107, Construction Road/Parking Area Stabilization <br /> BMP C120,Temporary and Permanent Seeding <br /> BMP C121, Mulching <br /> BMP C123, Plastic Covering <br /> BMP C125,Topsoiling/Composting <br /> BMP C140, Dust Control <br /> BMP C220, Storm Inlet Protection <br /> BMP C233, Silt Fence <br /> RUNOFF TREATMENT <br /> WWHM2012, as provided by DOE, has been used for sizing of the proposed combined <br /> detention/ stormwater wetland pond facility to provide treatment for the parking area and <br /> collected portion of 120th PI. <br /> CONVEYANCE CALCULATIONS <br /> With no significant pipe system there is no need for conveyance calculations. <br /> RUNOFF CONTROL BMP'S <br /> An open detention pond will be used for runoff control. <br /> PROTECTION OF WETLANDS <br /> There are no wetlands on or near the site. <br /> OPERATIONS AND MAINTENANCE <br /> See MR9 for more information. <br /> P:\Work\Projects\2018\18-141 Emory's\CE\DOCS\Final SSP 18-141.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.