My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 12/13/2021
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Snohomish County 12/13/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:13 AM
Creation date
1/7/2022 1:16:04 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
12/13/2021
End Date
3/30/2027
Department
Public Works
Department Project Manager
Corey Hert
Subject / Project Title
Traffic Control Device & Street Light ILA
Public Works WO Number
PW3132
Tracking Number
0003138
Total Compensation
$5,000.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Work Order Requests. <br /> No work order request is necessary for Traffic Control Device Maintenance Services or <br /> Street Light Maintenance Services set out in Exhibit A,which services will be performed <br /> on a regularly scheduled or emergency basis. Requests for Construction Services, <br /> Engineering Services and other work not specifically set out in Exhibit A as Maintenance <br /> r.: <br /> Services shall be processed through Work Order Requests in accordance with the <br /> following: • <br /> A. If the City desires the County perform Services other than Maintenance Services <br /> specifically listed in Exhibit A,then the City shall direct a Work Order Request to the <br /> County Administrator. These Work Orders Requests shall adequately describe the <br /> scope of the work to be performed and indicate a desired completion date. The <br /> County may require the City to prepare a road plan and profile or sketches to <br /> adequately describe the scope,intent and detail of the work. <br /> B. Upon receipt of a Work Order Request, the County shall review the Services <br /> requested therein. The County, in its sole discretion,may agree to accept or reject the <br /> Work Order Request. Should the County reject the Work Order Request, it shall <br /> advise the City to that effect. Should the County accept the Work Order Request, it <br /> shall (1) advise the City of such, and (2)prepare an estimate of the time and costs to <br /> complete the work, which it will provide to the City.The estimate is non-binding and <br /> does not constitute a bid or contract maximum, and the City shall remain liable for the <br /> entire actual cost as described in Section 6 below. <br /> C. Upon receipt of the approval of the Work Order Request and estimate, the City may <br /> either issue a written Notice to Proceed which authorizes the County to perform the y' <br /> requested work or a written notice rejecting the County's estimate. The issuance of a <br /> Notice to Proceed shall constitute a representation by the City that the schedule of <br /> charges and basis of payment are acceptable and sufficient funds are appropriated to <br /> pay for the work. The issuance of a rejection by the City shall relieve the County of <br /> all obligations to perform any work identified in the Work Order Request. If no <br /> written Notice to Proceed is received by the County from the City within twenty-one <br /> (21) days from the date of the County's response approving the Work Order and <br /> estimate, then the County will treat the response and estimate as if they had been <br /> rejected. <br /> D. The City may make changes to the requested Services by submitting a new Work <br /> Order Request outlining in detail the desired changes to the Services. The County <br /> may,in its sole discretion,accept or reject the new Work Order Request,PROVIDED <br /> HOWEVER that the County's acceptance is not required where the City is <br /> terminating work pursuant to Section 14 below. The City shall be liable for all <br /> increases in cost,if any,which may be incurred by changes to the Services,including <br /> but not limited to clean-up and any non-cancelable costs. <br /> INTERLOCAL AGREEMENT Page 5 of 14 <br /> BETWEEN SNOHOMISH COUNTY AND THE CITY OF EVERETT <br /> FOR TRAFFIC CONTROL DEVICE AND STREET LIGHT MAINTENANCE, <br /> ENGINEERING AND CONSTRUCTION SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.