My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hart Crowser 12/13/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
Hart Crowser 12/13/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 2:49:50 PM
Creation date
1/7/2022 2:48:58 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Hart Crowser
Approval Date
12/13/2021
Council Approval Date
12/1/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
On-Call Geotechnical Engineering Services
Tracking Number
0003144
Total Compensation
$250,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oHMTCROINSER <br /> Kit Pricing List - 2019 <br /> UP code Geotech Kits <br /> GE001 Backfill Control/Footing Check $5 per day <br /> GE002 Drilled Pile/Shafts $20 per day <br /> GE003 Driven Pile $30 per day <br /> GE004 Geotech Drilling $35 per day <br /> GE005 Inclinometer $155 per day <br /> GE006 OSM $50 per day <br /> GE007 Test Pit $35 per day <br /> GE008 Tieback $30 per day <br /> GE009 Shelby Tube Sampling $25 per day <br /> GE010 Pit Box Test $400 per day <br /> GE011 Manual Field Exploration $100 per day <br /> GE012 Concrete Coring $300 per day <br /> UP code Environmental Kits <br /> EN001 Abandoned Mine Sampling $15 per day <br /> EN002 Soil Sampling w/o PID $45 per day <br /> EN016 Soil Sampling w/PID $125 per day <br /> EN003 Construction Observation w/o PID $25 per day <br /> EN017 Construction Observation w/PID $105 per day <br /> EN015 Decontamination $25 per day <br /> EN004 Groundwater Sampling -Monitoring Wells $115 per day <br /> EN005 Low Level Mercury Water Sampling $15 per sample <br /> EN006 Monitoring Well Development $45 per day <br /> EN007 Sediment Sampling—Intertidal $25 per sample <br /> EN008 Sediment Sampling—Van Veen from Boat $30 per sample <br /> EN009 Sediment Sampling—Vibracore from Boat $35 per sample <br /> ENO18 Slug Test $350 per day <br /> EN010 Soil Boring Investigation $21 per day <br /> EN019 Soil Vapor Extraction $195 per day <br /> EN014 Surface Water Sampling-from Boats $75 per day <br /> ENO11 Surface Water Sampling-Streams $15 per sample <br /> EN012 UST Assessment $27 per day <br /> UP code Natural Resources Proposed Kit Price Kit Rate <br /> NR001 Boat Kit $200 per day <br /> NR002 Camping Kit wlo tent $25 per day <br /> NR003 Camping Kit with tent $40 per day <br /> NR004 Sediment Sampling Kit $30 per day <br /> NR005 Water Quality Kit $100 per day <br /> NR006 Wetland Kit $40 per day <br /> NR007 Fish Salvage w/o electrofisher $45 per day <br /> NR008 Fish Salvage with electrofisher $120 per day <br /> NR009 Marine Mammel Monitoring(per person) $80 per day <br /> UP code General Field Proposed Kit Price Kit Rate <br /> HC001 Locates Kit $40 per day <br /> v051419 <br />
The URL can be used to link to this page
Your browser does not support the video tag.