My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hart Crowser 12/13/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
Hart Crowser 12/13/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 2:49:50 PM
Creation date
1/7/2022 2:48:58 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Hart Crowser
Approval Date
12/13/2021
Council Approval Date
12/1/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
On-Call Geotechnical Engineering Services
Tracking Number
0003144
Total Compensation
$250,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Int <br /> r H RTCROWSCR <br /> GEOTECHNICAL KITS <br /> Backfill Control/ <br /> Footing Check Drilled Pile/Shafts Driven Pile Geotech Drilling <br /> GE001 GE002 GE003 GE004 <br /> Large Sample Bags Cloth Tape 100-300' Clinometer/Level Garbage Bags <br /> T-Probe Eng.Tape 25' Cloth Tape 100-300' hand tools <br /> Standard PPE Mining Lamp Counter Knife <br /> Standard PPE Ear Protection Paper Towels <br /> Eng.Tape 25' Pocket Penetrometer <br /> Laser and stand Shelby caps, internal <br /> Stop Watch Torvane <br /> Standard PPE Ziplocks <br /> Standard PPE <br /> Saximeter separate Geotech jars separate <br /> $5/day $20/day $30/day $35/day <br /> Inclinometer OSM Test Pit Tieback <br /> GE005 GE006 GE007 GE008 <br /> Eng.Tape 25' Brunton Eng.Tape 25' Clinometer <br /> hand tools Cloth Tape 100-300' hand tools Cloth Tape 100-300' <br /> Inclinometer accessories Eng. Tape 25' Large Sample Bags Eng.Tape 25' <br /> Inclinometer Flagging Tape Pocket Penetrometer Mining Lamp <br /> Field Tablet Mining Lamp shovel Standard PPE <br /> weighted tape/sounder Standard PPE Torvane <br /> Standard PPE Ziplocks <br /> Standard PPE <br /> $155/day $50/day $35/day $30/day <br /> Manual Field <br /> Shelby Tube Sampling" PIT Box Test Exploration Concrete Coring <br /> GE009 GEM GE011 GE012 <br /> `assuming driller provides <br /> tubes Pit Box(2) Hand auger Coring machine <br /> Drive probe(Sowers or <br /> caps(external) fire hose (to 500 ft) Williamson) Portable generator <br /> duct tape flowmeter Hand tools Shop vacuum <br /> expanded inserts(2) hydrant kit Pocket penetrometer Concrete patch <br /> extra tubes(3) backflow preventor Torvane Core barrel wear and tear <br /> ladel <br /> stove <br /> tube carrier <br /> wax <br /> Standard PPE <br /> Standard PPE <br /> Standard PPE Paper Towels and Standard PPE <br /> Geotech jars separate Ziplocs separate <br /> $25/day $400/day $100/day $300/day <br />
The URL can be used to link to this page
Your browser does not support the video tag.