My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hart Crowser 12/13/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
Hart Crowser 12/13/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 2:49:50 PM
Creation date
1/7/2022 2:48:58 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Hart Crowser
Approval Date
12/13/2021
Council Approval Date
12/1/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
On-Call Geotechnical Engineering Services
Tracking Number
0003144
Total Compensation
$250,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i HMTCROWSU? <br /> ENVIRONMENTAL KITS <br /> Construction <br /> Abandoned Mine Observation Groundwater Sampling Kit- Decontamination <br /> Sampling Kit Soil Sampling Kit Kit Monitoring Wells Kit <br /> EN001 EN002/EN016 EN0031 EN017 EN004 EN015 <br /> buckets <br /> camera cloth tape camera DI water <br /> DI water DI water cloth tape garbage bags alconox or liquinox pack <br /> field book field book garbage bag flow cell aluminum foil(1 roll) <br /> flagging flagging gloves(1 box) gloves(1.2 pair/well) bucket <br /> shovel garbage bags sheen bowl ice carboy deionized water <br /> sprayer gloves(1 box) sprayer Marine batteries scrub brush <br /> SS spoons and bowls ice Ziplocs(1 gal&2 qt boxes) paper towels spray bottles <br /> tape measure paper towels Standard PPE sprayer Standard PPE <br /> visqueen sprayer tubing-1/4"poly(200 ft) <br /> Standard PPE SS spoons and bowls tubing-#24 Silicon(5 ft) <br /> Ziplocs(1 gal&2 qt boxes) well tools/calibration standards <br /> Standard PPE PID separate Ziplocs(1 gal&2 qt boxes) <br /> PPD separate traffic cones <br /> Standard PPE <br /> $15/day $45/day wlout PID $25/day w/out PID $115/day $25/day <br /> $125/day w/PID $105 I day wl PID (Rent In-Situ WI water quality sonde) <br /> Low Level Mercury Water Sediment Sampling Kit—Surface <br /> Sampling Kit—clean Sediment Sampling Kit— Grab using Van Veen from Boat- <br /> hands/dirty hands Monitoring Well Intertidal-per day(estimate 8 per day <br /> technique Development Kit samples) (estimate 8 samples) Slug Test Kit <br /> EN005 EN006 EN007 EN008 EN018 <br /> field notebook Bailer/surge block camera aluminum foil Transducer-vented <br /> garbage bag buckets field notebook camera Data Reader <br /> car battery garbage bags(4) field notebook Water Level Indicator <br /> Standard PPE DI water gloves(1 box) garbage bags(4) Rope(up to 200 ft) <br /> gloves(pair per well) ice(8 bags) gloves(1 box) Slug(2-3) <br /> pump:2 stage(plastic) paper towels(4 rolls) graduated cylinder gloves(1 box) <br /> rope small ruler ice(8 bags) plastic bags <br /> sprayer SS spoons and bowls Leadline Standard PPE <br /> tubing-1/4"poly(200 ft) Visqueen(if necessary) Personal flotation device <br /> tubing-#24 Silicon(5 ft) Whiteboard sieve#200 <br /> well tools Ziplocs(1 gal&2 qt boxes) small ruler <br /> Standard PPE Standard PPE SS spoons and bowls <br /> Turkey baster <br /> visqueen <br /> whiteboard <br /> Ziplocs(1 gal&2 qt boxes) <br /> Standard PPE <br /> (check out generator,if needed? <br /> $15/day $45/day $25/day $30/day $350/day <br />
The URL can be used to link to this page
Your browser does not support the video tag.