Laserfiche WebLink
Port of Everett <br /> Engineering & Planning <br /> DESIGN REVIEW COMMENT FORM <br /> Drawing or Reviewer Comment NE Response/Resolution c o <br /> z 3 y Specification '> o U <br /> CD <br /> .� ° Reference 0 w <br /> E <br /> 4.4 Ce "c <br /> YIN YIN <br /> 16. COE C5.04 Modify note 4. Note. <br /> 17. COE C6.01 Show access aisle for accessible space. Accessible route Noted <br /> from aisle to pedestrian network also required. <br /> 18. COE C6.02 Modify note 5 as noted on the plan Noted. <br /> • 19. COE C6.04 Correct Note indicator 2 to 3 Noted, sheet has been corrected �. <br /> 20. COE MEMO Please provide documentation that the system has been Modular Wetland has been contacted about this project and will be <br /> reviewed and accepted by the manufacturer. The review providing a letter addressing the City's comments <br /> should address the fact that the treatment media will be <br /> regularly inundated and the fairly significant bypass flows <br /> which appear to be being handled by the internal bypass <br /> system. <br /> 154016_SEMWL Permit Revisions Comment Responses.docx Page 3 of 3 <br />