Laserfiche WebLink
Port of Everett <br /> Engineering& Planning <br /> DESIGN REVIEW COMMENT FORM <br /> ` Drawing or Reviewer Comment A/E Response/Resolution E <br /> z 3 (I) Specification d o w <br /> E .� Reference <br /> YIN Y/N <br /> 9. COE C4.04 Tracer Wire is required on force main. Include connection The forcemain line has been deleted from the project. <br /> points on both ends of the tracer wire. Tracer wire run not Future forcemain pipes will detail the tracer wire. , <br /> to exceed 400' between connection points. V <br /> 10. COE C5.01 Add note "COE Crews to perform this work under a PND will add the following note: "The Contractor <br /> • separate utility permit per cost estimate by COE water dept, shall coordinate all waterline work with the COE Water <br /> paid for at owner/contractor's expense. Dept. City of Everett crew to perform all work on live <br /> water appurtenances (including existing valves, mains, <br /> hydrants, etc.). COE will perform this work under a <br /> separate utility permit paid for at the Owner's expense. <br /> Contact Jim Spooner, 425-257-8827, <br /> J S poo ne r(a�everettwa.g ov." <br /> 11. COE C5.01 City does not have record of this line. Is it Private/Poe? See attached 14th Street Record Drawings. <br /> Detailed As-builts and Easements required. <br /> 12. COE C5.02 All work on/connections to existing live main shall be PND will add the following note: "The Contractor <br /> performed by COE Water Dept Crews. Coordinate w/COE shall coordinate all waterline work with the COE Water <br /> by Contacting Jim Spooner: 425-257-8827, Dept. City of Everett crew to perform all work on live <br /> JSPooneraeverettwa.gov" water appurtenances (including existing valves, mains, <br /> hydrants, etc.). COE will perform this work under a <br /> separate utility permit paid for at the Owner's expense. <br /> Contact Jim Spooner, 425-257-8827, <br /> • JSpooner(a�everettwa.gov." <br /> 13. COE C5.02 This looks like it feeds to docks. If this is true, an RPBA is Noted. <br /> required after the meter. <br /> 14. COE C5.03 Move valve to cross as noted Noted, valve has been moved. <br /> 15. COE C5.03 Work to be done by COE Water Dept Crews under PND will add the following note: "The Contractor <br /> separate utility permit per cost estimate by COE Water shall coordinate all waterline work with the COE Water <br /> Dept and paid for at the contractors expense. Dept. City of Everett crew to perform all work on live <br /> water appurtenances (including existing valves, mains, <br /> hydrants, etc.). COE will perform this work under a <br /> separate utility permit paid for at the Owner's expense. <br /> Contact Jim Spooner, 425-257-8827, <br /> JSpoonerAeverettwa.gov." <br /> 154016_SEMWL Permit Revisions Comment Responses.docx Page 2 of <br /> owaq <br />