Laserfiche WebLink
Tony Lee <br /> From: Doug Geniesse <doug@d-geniesse.com> <br /> Sent: Saturday, February 13, 2021 12:09 PM <br /> To: Tony Lee <br /> Cc: Sabrina Good <br /> Subject: Re: 504 View Ridge Dr(B2101-040) <br /> Tony,thx. <br /> I enjoy the semi heated concept! Let's go with that. <br /> I was going to add another heater to the studio. But will keep the heat to the bath to protect the plumbing-on days like <br /> today.Other days will go natural. It is the NW after all. <br /> Thx again.The vision of a thousand $3 bills flying out the window shocked me. <br /> */ Cheers. Doug <br /> Doug Geniesse <br /> doug@d-geniesse.com <br /> 620-926-1223 <br /> On Feb 13,2021, at 10:31 AM,Tony Lee<TLee@everettwa.gov>wrote: <br /> Hi Doug—I like energetic(vs. Hyper that everyone else calls me), much appreciated. <br /> On the plans I put'if heated'to give you an out. If you want to treat the space as a 'semi-heated space' <br /> per the energy code we can make that work. Please note that those provisions changed and now <br /> require the same insulation as a fully-heated space.This approach will help maintain freeze protection <br /> but won't be allowed to put in more heat unless you increase the insulation at some later date. <br /> Following what makes some sense: <br /> If we agree to a minimum of R-15 in the existing 2x4 walls, R-21 in the existing or new 2x6 walls and R-21 <br /> in the ceilings along with the 38 degree bathroom limitation that I can approve that. <br /> Keep this email with you plans to show the inspector and we are good. <br /> Thanks,Tony <br /> <image002.png> <br /> Tony Lee <br /> Building Official I Permit Services <br /> 425.257.8812 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> Hours: M/W/Th/F: 7:30am-12:00pm & 1:OOpm-3:00pm;Tu: 1:OOpm-3:OOpm <br /> everettwa.gov I Facebook I Twitter <br /> 1 2 <br />