Laserfiche WebLink
• <br /> 1211.1 <br /> CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> December 13, 2019 <br /> Mr. Michael Snitko <br /> Washington Flippers, LLC <br /> 2833 181st Place NW <br /> Stanwood, WA 98292 <br /> Email Address: michaelsnitko75@gmail.com <br /> RE: Owner: Washington Flippers, LLC <br /> Job Address: 844 Olympic Blvd <br /> Plan Check Number: CW1910-001, First Structural Review <br /> Dear Mr. Snitko, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments address structural issues only. <br /> Comments for non-structural issues have been issued separately. Additional revisions or additions <br /> may be required by other departments including Public Works, Planning, and Fire. <br /> Code citations provided in the following comments reference the 2015 International Building Code <br /> (IBC), the 2015 International Existing Building Code (IEBC), the 2015 International Property <br /> Maintenance Code (IPMC), the 2015 International Fire Code (IFC), the 2015 International <br /> Mechanical Code (IMC), and the 2015 International Energy Conservation (IECC), and the 2015 <br /> Washington State Energy Code (WSEC). The current IBC referenced standard for accessible design <br /> is the 2009'Accessible and Usable Buildings and Facilities"(ICC/ANSI A117.1). Federal ADA, FHA, <br /> and HUD regulations and standards, including the Fair Housing Accessibility Guidelines, may be <br /> more restrictive. References to other design standards include the current edition. <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to the Building Division for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations. <br /> Submittal documents shall contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted codes. Upon submittal of the revised documents, your application <br /> will be given priority and plan reviews will recommence. <br /> Page 1 of 7 <br />