My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
844 OLYMPIC BLVD 2022-01-20
>
Address Records
>
OLYMPIC BLVD
>
844
>
844 OLYMPIC BLVD 2022-01-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 3:27:24 PM
Creation date
1/20/2022 3:21:50 PM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
844
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Snitko <br /> Washington Flippers, LLC <br /> Plan Check Number: CW1910-001, First Structural Review <br /> December 13, 2019 <br /> Sections 4.1.1 and 4.2.1. Existing roof diaphragm was not modified. Modified vaulted ceiling did <br /> not affect roof diaphragm nor the connection to the shear walls <br /> 24. The proposed design includes a new deck projecting 15.5 feet from the south face of the <br /> building. The deck exceeds the maximum allowable projection for a horizontal cantilever per <br /> AWS SDPWS-15 Section 4.2.5.2 The deck should be provided with a second line of lateral <br /> resistance along the north side. The structural drawings should be revised to specify additional <br /> lateral elements. Sections and details should be provided to specify the required construction. <br /> Additional foundations may be required. Structural calculations substantiating the design shall <br /> be submitted for review. See IBC Sections 1603.1, 1604.1, 1604.4, and 2306.1. The IRC <br /> Currently does not state the design requirements for Lateral Loads, but it does provide an approved <br /> design per section R507.2.3 of the IRC. IRC R507.1 requires anchorage of the deck to the primary <br /> structure to resist lateral loads. Further,the IRC includes hold down tension devices as a prescriptive <br /> means to achieve compliance with the lateral load connection requirements without mandated <br /> engineering. Further more,AWS SDPWS-15 Section 4.2.5.2 allows a L:W ratio no greater than <br /> 1:1. The deck length (15' 1.5") is shorter than the Width at (15'9"). Therefore the Deck <br /> Diaphragm conforms to SDPWS. <br /> 25.The deck is laterally-supported in the north south direction by fastening it to the main building <br /> per Detail F/S1. Note that Detail F/S1 provides two different connections; see additional <br /> comments above. Calculations substantiating the lateral load path shall be submitted for <br /> review. At a minimum, the connection capacity should satisfy the requirements of ASCE 7-10 <br /> Section 12.1.3. Where the connection is subject to multi-axial loading (i.e., gravity loading and <br /> seismic loading in one or both orthogonal directions), the connection should be evaluated for <br /> concurrent loading per AWC NDS-15 Section 12.4. See IBC Sections 1604.1, 1604.4, and <br /> 2306.1. Both connection details are adequate. See answers above. <br /> Miscellaneous: <br /> 26.Architectural Sheet 3-of-3 includes details for the guards around the deck. The following <br /> comments shall be addressed: <br /> a. The design of the guards,the supporting framing, and the connections to the supporting <br /> framing, should be designed to comply with IBC Section 1607.8.1. <br /> b. The details specify a design load and holdowns"per manufacturer". The make and model <br /> of the required holdowns should be specified in the drawings. <br /> c. The details specify a couple distance between the 1/2"through-bolts of 2"to 5". The <br /> minimum dimensions should be specified. Note that 2"does not appear adequate to <br /> provide the required resistance at the connection. Additional manufacturer details, <br /> drawings, and model provided for the existing aluminum railing. The other deck guard <br /> details follow the prescriptive code from R507.12. Both meet the code requirements and <br /> have been previously approved on projects throughout Everett. <br /> 0 3200 Cedar Street CD 425.257.8810 O everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.