Laserfiche WebLink
• <br /> CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> January 22, 2020 <br /> Mr. Bryan Lane <br /> Lane Law Firm, PLLC <br /> 1313 E Maple Street <br /> Bellingham, WA 98225 <br /> Email Address: bryan@bryanlanelaw.com <br /> RE: Owner: Washington Flippers, LLC <br /> Job Address: 844 Olympic Boulevard <br /> Plan Check Number: CW1910-001-001, Building Permit Review <br /> Dear Mr. Lane, <br /> We are responding to your letter dated January 12, 2020, regarding the status of the building <br /> permit review for the proposed project at 844 Olympic Boulevard in Everett. This letter primarily <br /> addresses the structural review. The applicant has not completely addressed all comments <br /> provided in the most recent review, and therefore the building permit cannot be issued at this time. <br /> The building permit review letters issued to the applicant are attached for reference. <br /> The following brief chronology outlines the project history as it relates to the structural review: <br /> • The property was identified as having work being performed without a permit on <br /> 08/06/2019. The property was posted with a Stop Work order (Permit No. W1908-002). <br /> • Mr. Michael Snitko (herein"the applicant") consulted with Permit Services on 09/20/2019 <br /> regarding the requirements for a building permit application. The project scope was <br /> understood include only non-structural work at this time. <br /> • The applicant submitted an application for a building permit on 10/03/2019. <br /> • The first non-structural review letter was issued on 10/23/2019. The project scope was <br /> understood to be non-structural only. <br /> • The applicant submitted revised documents on 10/25/2019. <br /> • The second non-structural review letter was issued on 11/21/2019. The project was <br /> discovered to include structural work that was not shown in the construction drawings; see <br /> Comments 1 through 5, 10, and 13. The structural review could not be initiated at that <br /> time due to insufficient information in the drawings specifying the proposed structural work. <br /> • The applicant submitted revised documents on 12/09/2019 and 12/11/2019. <br /> • The first structural review letter was issued on 12/13/2019. The submittal documents (i.e., <br /> drawings and structural calculations) did not fully-comply with the building code. <br /> • The applicant submitted revised documents on 12/16/2019. <br /> • The second structural review letter was issued on 01/07/2020. The submittal documents <br /> did not fully-comply with the building code. <br /> Page 1 of 2 <br />