Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-09.3 Construction Requirements 2-9 I <br /> 2-09.4 Measurement 2-19 <br /> 2-09.5 Payment 2-19 <br /> 2-11 TRIMMING AND CLEANUP 2-20 <br /> 2-11.3 Construction Requirements 2-20 <br /> 2-11.4 Measurement 2-20 <br /> 2-11.5 Payment 2-20 <br /> DIVISION 3-AGGREGATE PRODUCTION 3-1 <br /> 3-01 PRODUCTION FROM QUARRY AND PIT SITES 3-1 <br /> 3-01.2 Material Sources, General Requirements 3-1 <br /> DIVISION 4-BASES 4-1 <br /> DIVISION 5-SURFACE TREATMENTS AND PAVEMENTS 5-1 <br /> 5-04 HOT MIX ASPHALT 5-1 <br /> 5-04.1 Description 5-1 <br /> 5-04.2 Materiails 5-1 <br /> 5-04.3 Construction Requirements 5-3 <br /> 5-06 PAVEMENT PATCHING 5-14 <br /> 5-06.1 Description 5-14 <br /> 5-06.2 Materials 5-14 <br /> 5-06.3 Construction Requirements 5-15 <br /> 5-06.5 Payment 5-16 <br /> DIVISION 6-STRUCTURES 6-1 <br /> DIVISION 7- DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, WATER <br /> MAINS, AND CONDUITS 7-1 <br /> 7-05 MANHOLES, INLETS, CATCH BASINS AND DRYWELLS 7-1 <br /> 7-05.1 Description 7-1 <br /> 7-05.2 Materials 7-1 <br /> 7-05.3 Construction Requirements 7-2 <br /> 7-05.4 Measurement 7-5 <br /> 7-05.5 Payment 7-5 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 7-5 <br /> 7-08.1 Description 7-5 <br /> 7-08.2 Materials 7-5 <br /> 7-08.3 Construction Requirements 7-6 <br /> 7-08.4 Measurement 7-9 <br /> 7-08.5 Payment 7-10 <br /> 7-09 WATER MAINS 7-10 <br /> 7-09.1 Description 7-10 <br /> 7-09.2 Materials 7-10 II <br /> 7-09.3 Construction Materials 7-10 <br /> 7-09.5 Payment 7-13 <br /> 7-17 SANITARY SEWERS 7-13111 <br /> 7-12.1 Description 7-13 <br /> 7-17.2 Materials 7-14 <br /> 7-17.3 Construction Requirements 7-14 <br /> 7-17. Measurement 7-16 <br /> 7-17.5 Payment 7-16 <br /> 7-20 SANITARY SEWER FORCEMAINS 7-16 <br /> 7-20.1 Description 7-16 <br /> 7-20.2 Materials 7-17 <br /> 7-20.3 Construction Requirements 7-18 <br /> POE Combined Sewer Main Imp. ADVERTISEMENT FOR BIDS October 2021 <br /> Work Order#UP3768 SP-iv <br />