My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICITY OF EVERETT SPECIAL PROVISIONS <br /> I7-20.3 Measurement 7-20 <br /> 7-20.5 Payment 7-20 <br /> I DIVISION 8— MISCELLANEOUS CONSTRUCTION 8-1 <br /> 8-01 EROSION CONTROL AND WATER POLLUTION CONTROL 8-1 <br /> 8-01.1 Description 8-1 <br /> I 8-01.2 Materials 8-1 <br /> 8-01.4 Measurement 8-4 <br /> 8-01.5 Payment 8-4 <br /> 8-12 CHAIN LINK FENCE AND WIRE FENCE 8-5 <br /> I8-12.1 Description 8-5 <br /> 8-12.4 Measurement 8-5 <br /> 8-12.5 Payment 8-5 <br /> I DIVISION 9—MATERIALS 9-1 <br /> 9-03 AGGREGATES 9-1 <br /> 9-03.22 Sand Backfill for Pipe Zone 9-1 <br /> I 9-03.15 Native Material for Trench Backfill 9-2 <br /> 9-04 JOINT AND CRACK SEALING MATERIALS 9-2 <br /> 9-04.12 Watertight Pipe to Manhole Connection Boot 9-2 <br /> I 9-04.123 Flexible Coupling 9-2 <br /> 9-05 DRAINAGE STRUCTURES, CULVERTS AND CONDUITS 9-2 <br /> 9-05.12 Polyvinyl Chloride (PVC) Pipe 9-2 <br /> I 9-05.15 Metal Castings 9-3 <br /> 9-05.25 Fibergalss Reinforced Polymer Pipe (FRPP) 9-3 <br /> 9-05.32 Insertion Tee 9-8 <br /> 9-05.62 Synthetic Rubber Sleeve Seal 9-8 <br /> I9-05.64 Polypropylene Manhole and Hand Hold Steps 9-8 <br /> 9-05.66 Polypropylene Manhole Ladder 9-8 <br /> I APPENDIX A— REFERENCE MATERIAL <br /> APPENDIX B— STANDARD PLANS AND BMPS <br /> APPENDIX C - FORMS <br /> 1 APPENDIX D—CITY OF EVERETT AND PORT OF EVERETT AGREEMENT <br /> APPENDIX W—WAGE RATES <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> POE Combined Sewer Main Imp. ADVERTISEMENT FOR BIDS October 2021 <br /> Work Order#UP3768 SP-v <br />
The URL can be used to link to this page
Your browser does not support the video tag.