My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION B - BID ITEM DESCRIPTIONS <br /> ' Schedule A — Combined Sewer Main Improvements <br /> Bid Item 1 - Mobilization <br /> Measurement and Payment: Lump Sum (LS) <br /> The lump sum bid for mobilization shall constitute complete compensation for all of Contractor's <br /> preconstruction costs of preparatory work and operations including, but not limited to, those <br /> necessary for the movement of personnel, equipment, supplies and incidentals to the Project; for <br /> the establishment of offices, buildings and other facilities necessary for Work on this Project; for <br /> premiums on bonds and insurance for the Project, and for Work and operations that he must <br /> perform or costs he must incur before beginning production work on the various items on the <br /> Project. Mobilization also includes, but is not limited to, posting construction identification signs, <br /> securing permits, establishing safety and security measures, preparing a traffic control plan(s), <br /> preconstruction photographs, developing a Schedule of Values for lump sum bid items, submitting <br /> the project schedule and providing product and material submittals. Also include mobilization costs <br /> for all subcontracted work along with all costs for utility coordination noted on the Plans and in the <br /> Specifications. <br /> Items not included in this item include, but are not limited to: <br /> (a) Work covered by a specific bid item or Work that is to be included in a bid item or items. <br /> (b) Profit, interest on borrowed money, overhead or management costs. <br /> Partial payments will be made for the lump sum contract price for "Mobilization" as follows: <br /> (a) When 5% of the total original contract amount is earned from other bid items, 50% of the <br /> amount bid for mobilization, or 5% of the total original contract amount, whichever is the least, <br /> will be paid. <br /> (b) When 10% of the total original contract amount is earned from other bid items. 100% of the <br /> amount bid for mobilization, or 10% of the total contract amount, whichever is the least, will be <br /> I paid. <br /> Upon completion of all work on the project, payment of any amount bid for mobilization in excess <br /> of 10% of the total original contract amount will be paid. <br /> I <br /> Bid Item 2 - Surveying <br /> Measurement and Payment: Lump Sum (LS) <br /> Measurement for surveying will be the ratio of actual pipe installed and backfilled to the total <br /> quantity of pipe listed in the Proposal. <br /> The lump sum bid for surveying includes, but is not limited to, all costs associated with furnishing <br /> all labor, tools, survey instruments materials, and other equipment necessary for coordination with <br /> the Port of Everett and City and for locating and establishing project control points and benches, <br /> for setting and monitoring the location, elevation, alignment and grade of the Work as specified in <br /> 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES and the Plans. <br /> The lump sum bid item also includes, but is not limited to, all costs associated with furnishing all <br /> labor, tools, survey instruments, materials and other equipment necessary for verifying the rim and <br /> invert elevations, prior to construction, of all existing manholes and pipes where connections are <br /> to be made. <br /> I <br /> POE Combined Sewer Main Imp. Division B—Bid Item Descriptions October 2021 <br /> Work Order#UP3768 SP-0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.