Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The lump sum also includes, but is not limited to, all costs associated with furnishing all labor, <br /> tools, survey instruments, materials and other equipment necessary for obtaining the "as <br /> constructed" location and elevations of the Work, in particular, sewer pipe invert elevations and <br /> other information necessary for production of the Record Drawing (As-Constructed) documents <br /> meeting the requirements defined in RECORD DRAWINGS of these Special Provisions. <br /> Bid Item 3 - SPCC Plan <br /> Measurement and Payment: Lump Sum (LS) <br /> The lump sum bid for the Spill Prevention, Control and Countermeasures (SPCC) Plan includes, <br /> but is not limited to, all costs associated with complying with the requirements of Section 1-07(15).1 <br /> of the Standard Specification. I <br /> Bid Item 4 - Force Account <br /> Measurement and Payment: Force Account (FA) <br /> This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE ACCOUNT; <br /> except, as modified below. <br /> The Force Account bid item has been included for specific and/or miscellaneous work items listed <br /> below and for any additional work directed by the Engineer that is not required by the original <br /> Contract and to address changed conditions or unanticipated work. The amount indicated in the <br /> Proposal for this bid item is to provide a common bid amount. The actual amount paid under this <br /> bid item may vary from no payment to the full amount of the bid item. Work performed under this <br /> bid item will be initiated with a work directive issued by the Engineer. <br /> In lieu of the preceding prescribed method of determining payment for Force Account work, <br /> payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br /> Contractor prior to beginning the Force Account work. <br /> The following miscellaneous construction work will be paid for by Force Account as specified in 1- <br /> 09.6 FORCE ACCOUNT. For the purpose of providing a Common Proposal for all Bidders, and <br /> for that purpose only, the City has estimated an amount and included it in the bid item for Force <br /> Account work to become part of the total Bid by the Contractor. <br /> (a) Cost for additional excavation, fittings, and labor to make grade adjustments to the sewer <br /> mains for unknown underground conflicts and conflicts due to being unmarked or mismarked <br /> utilities in the field. <br /> (b) Restoration or removal of existing Port of Everett improvements for unknown conflicts <br /> including, but not limited to existing structures, vaults, and utilities. <br /> (c) Pavement Patching and site access restoration <br /> (d) Cultural Monitoring Engineer or directed Work in accordance with 1-07.16(4). <br /> (e) Temporary Traffic Controls <br /> (f) Other work as directed by the Engineer. <br /> Bid Item 5 - Removal of Structures and Obstructions <br /> Measurement and Payment: Ton (TON) <br /> Measurements shall meet the requirements of 1-09.2. This unit price bid item includes all costs <br /> associated with removal, disposal or of various existing improvements, pavements, structure I <br /> foundations, structures, pipes, curb and gutter, valves, manholes, catch basins, removal of H piles <br /> and various other items as indicated on the Plans and as described in 2-02 of the project special <br /> provisions. Abandonment, where required is considered incidental to the Project. ' <br /> POE Combined Sewer Main Imp. Division B—Bid Item Descriptions October 2021 <br /> Work Order#UP3768 SP-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.