Laserfiche WebLink
November 23,2021 <br /> 6. Sheet C06: Remove and replace the callout at STA 33+02.41 with the following: <br /> 12" CHECK VALVE AND VALVE VAULT <br /> N 361254.86 <br /> E 1301563.98 <br /> 7. Sheet C08, Detail 1: Remove "42'X42'X24" TEE WITH 24"BLIND FLANGE"callout with <br /> the following: <br /> 42"X42"X24" TEE WITH 24" (3/8-INCH THICK 316 STAINLESS STEEL) BLIND <br /> FLANGE <br /> 8. Sheet C08, Detail 1: Remove "LIFTING LUG MOUNTED ON BLIND FLANGE"callout with <br /> the following: <br /> 1/2-INCH DIAMETER 316 STAINLESS STEEL LIFTING LUG MOUNTED ON BLIND <br /> FLANGE I <br /> 9. Sheet C08, Detail 2: Remove and replace Note P with the following: <br /> UTILITY STRUCTURES SHALL BE DESIGNED TO MEET LOADING CRITERIA AS <br /> 111 <br /> SPECIFIED IN DETAIL 3/C10. <br /> PRE-BID MEETING <br /> A non-mandatory Pre-Bid Conference was conducted on November 17, 2021. The Pre-bid <br /> Meeting Agenda is provided as an attachment. <br /> INFORMATION AND CLARIFICATIONS ;I <br /> Information and clarification requests that were received prior to issuance of this addendum are <br /> provided as an attachment. I <br /> All other requirements of the contract documents remain in effect. <br /> I <br /> City of Everett <br /> ._ <br /> Souheil Nasr, PE <br /> Project Manager <br /> I <br /> Attachments: <br /> • Division C—Contract Documents <br /> • Appendix A— Exxon Mobile ADC Contamination <br /> • Appendix D—Temporary Construction License Agreement <br /> • Pre-Bid Meeting Agenda <br /> • Information Request and Clarification Summary <br /> POE Combined Sewer Main Imp. Addendum No. 1 <br /> Work Order#UP3768 Page 12 of 12 <br /> I <br />