My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Construction 1/18/2022
>
Contracts
>
Capital Contract
>
Northwest Construction 1/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:13:02 AM
Creation date
1/21/2022 1:35:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Construction
Approval Date
1/18/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Tracking Number
0003148
Total Compensation
$4,551,566.85
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 8/18/2022 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc 4/20/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Northwest Corporation Inc. 6/10/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 23,2021 <br /> 6. Sheet C06: Remove and replace the callout at STA 33+02.41 with the following: <br /> 12" CHECK VALVE AND VALVE VAULT <br /> N 361254.86 <br /> E 1301563.98 <br /> 7. Sheet C08, Detail 1: Remove "42'X42'X24" TEE WITH 24"BLIND FLANGE"callout with <br /> the following: <br /> 42"X42"X24" TEE WITH 24" (3/8-INCH THICK 316 STAINLESS STEEL) BLIND <br /> FLANGE <br /> 8. Sheet C08, Detail 1: Remove "LIFTING LUG MOUNTED ON BLIND FLANGE"callout with <br /> the following: <br /> 1/2-INCH DIAMETER 316 STAINLESS STEEL LIFTING LUG MOUNTED ON BLIND <br /> FLANGE I <br /> 9. Sheet C08, Detail 2: Remove and replace Note P with the following: <br /> UTILITY STRUCTURES SHALL BE DESIGNED TO MEET LOADING CRITERIA AS <br /> 111 <br /> SPECIFIED IN DETAIL 3/C10. <br /> PRE-BID MEETING <br /> A non-mandatory Pre-Bid Conference was conducted on November 17, 2021. The Pre-bid <br /> Meeting Agenda is provided as an attachment. <br /> INFORMATION AND CLARIFICATIONS ;I <br /> Information and clarification requests that were received prior to issuance of this addendum are <br /> provided as an attachment. I <br /> All other requirements of the contract documents remain in effect. <br /> I <br /> City of Everett <br /> ._ <br /> Souheil Nasr, PE <br /> Project Manager <br /> I <br /> Attachments: <br /> • Division C—Contract Documents <br /> • Appendix A— Exxon Mobile ADC Contamination <br /> • Appendix D—Temporary Construction License Agreement <br /> • Pre-Bid Meeting Agenda <br /> • Information Request and Clarification Summary <br /> POE Combined Sewer Main Imp. Addendum No. 1 <br /> Work Order#UP3768 Page 12 of 12 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.