Laserfiche WebLink
rNovember 23,2021 <br /> Provide East Jordan 8555 Series, two piece slip type box with 6800 two and one-half inch <br /> skirt drop lid or City approved equal. <br /> Plastic valve boxes with a cast iron lid having dimensions conforming to a number 940 valve <br /> box, as manufactured by Handley Industries, or City approved equal, are acceptable for <br /> valve boxes located in grass, non-paved or paved non-vehicular traffic areas. <br /> 9-30.3(5) Valve Marker Posts <br /> Delete first and second paragraphs of 9-30.3(5) and substitute the following: <br /> Post shall be 4-inch diameter, 42-inch tall, fluorescent orange, low density polypropylene <br /> portable traffic delineator post with two reflectorized strips. <br /> 9-30.3(6) Valve Stem Extension <br /> Revise the first paragraph of 9-30.3(6) to read as follows: <br /> Provide valve stem extension in accordance with COE Standard Drawing No. 504. <br /> 9-30.3(8) Tapping Sleeve and Valve Assembly <br /> tRevise the last sentence of 9-30.3(8) to read as follows: <br /> Provide all stainless-steel tapping sleeves, Romac SST, Romac SSTIII, or City approved <br /> equal. <br /> SPECIAL PROVISION APPENDICES <br /> Appendix A— Reference Material: <br /> Add the attached document to Appendix A: <br /> • Exxon Mobile ADC Contamination <br /> Appendix D — City of Everett and Port of Everett Agreement: <br /> Add the attached document to Appendix D: <br /> • Temporary Construction License Agreement <br /> CONTRACT DRAWINGS <br /> 1. Sheet G03: Remove Note 7 in its entirety. <br /> 2. Sheet G03: Remove Note 13 in its entirety. <br /> 3. Sheet G03: Remove and replace Note 12 with the following: <br /> EXISTING MONITORING WELLS WITHIN THE EXCAVATION FOOTPRINT TO BE <br /> DECOMMISSIONED. CONTRACTOR IS RESPONSIBLE FOR PRESERVING AND <br /> PROTECTING EXISTING WELLS WITHIN 10 FEET OF THE ACTIVE CONTRUCTION <br /> ZONE. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. LOCATIONS OF <br /> EXISTING MONITORING WELLS SHOWN IN GEOTECHNICAL ENGINEERING <br /> REPORT, DATED JUNE 17, 2021 PREPARED BY LANDAU ASSOCIATES. <br /> 4. Sheet C05: Remove Note 7 in its entirety. <br /> 5. Sheet C06: Remove Note 6 in its entirety. <br /> POE Combined Sewer Main Imp. Addendum No. 1 <br /> Work Order#UP3768 Page 11 of 12 <br /> I <br />