Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> Further supplement 1-02.4(1) by adding the following: <br /> 1-02.4(1)A Interpretation of Contract Documents <br /> Should a Bidder find what is believed to be discrepancies in or omissions from the <br /> Plans, Specifications, or Special Provisions, or should the Bidder be in doubt as to <br /> their meaning, Bidder may submit to the Engineer a written request for an <br /> interpretation thereof. The Bidder submitting the request will be responsible for its <br /> prompt delivery. Any interpretation of the documents, if made, will be made only by <br /> addendum duly issued and a copy of such addendum will be mailed or delivered to <br /> each Bidder receiving a set of such documents. All requests for interpretations <br /> must be received by the City or Engineer no later than 7 calendar days prior to <br /> the Proposal opening date. All questions regarding the Contract Documents shall <br /> be referred to the City or Engineer at the address provided in the Contract Documents. <br /> 1-02.4(1)B Prevailing Wages <br /> (******) <br /> Bidder is directed to 1-07.9(1) of these Special Provisions for requirements regarding <br /> applying payment of prevailing wage rates for employment of labor on within <br /> Snohomish County. <br /> 1-02.4(2) Subsurface Information <br /> Delete the first paragraph and substitute the following: <br /> If the City has made subsurface investigation of the site of the proposed Work, the <br /> boring log data and soil sample test data accumulated by the City will be made <br /> available for inspection by the Bidders. The boring logs and soil sample test data shall <br /> NOT be considered as part of the Contract, regardless of whether such data is <br /> supplied as an Appendix to the Special Provisions or not. In addition, the City makes <br /> no representation or warranty expressed or implied that: <br /> 1. The Bidders' interpretations from the boring logs are correct, <br /> 2. Moisture conditions and indicated water tables will not vary from those <br /> found at the time the borings were made, and <br /> 3. The ground at the location of the borings has not been physically disturbed <br /> or altered after the boring was made. <br /> Supplement 1-02.4(2) by adding the following: <br /> The POE-NT Geotechnical Report, boring log data and soil sample data, if any, can <br /> be found in Appendix A. <br /> 1-02.5 Proposal Forms <br /> Delete this section and substitute the following: <br /> The Proposal Form identifies the project and its location and describes the work. It also lists <br /> estimated quantities, units of measurement, the items of work, and the materials to be furnished <br /> at the unit bid prices. The Bidder shall complete spaces on the proposal form that call for, and <br /> are not limited to, unit prices; extensions; summations; the total bid amount; signatures; date; <br /> and, where applicable, retail sales taxes and acknowledgment of addenda; the bidder's name, <br /> address, bidder's email address, telephone number, and signature; the bidder's <br /> I <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> 111 Work Order#UP3768 SP 1-9 <br />