Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> industries or through a civil judgment entered by a court of limited or general 1 <br /> jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of <br /> chapter 49.46, 49.48, or 49.52 ROW. I <br /> 6. Apprentices. If the Project is subject to the apprenticeship utilization requirements in <br /> RCW 39.04.320, not have been found out of compliance by the Washington state <br /> apprenticeship and training council for working apprentices out of ratio, without <br /> appropriate supervision, or outside their approved work processes as outlined in their <br /> standards of apprenticeship under chapter 49.04 RCW for the one-year period <br /> immediately preceding the date of the bid solicitation. I <br /> 1-02.1(2) Supplemental Bidder Responsibility Criteria <br /> This Project will not be subject to supplemental bidder responsibility criteria. <br /> 1-02.2 Plans and Specifications <br /> Delete all paragraphs in 1-02.2 and substitute the following: <br /> Information as to where Bid Documents can be obtained or reviewed will be found in the Call <br /> for Bids (Advertisement for Bids) for the Work. <br /> After Award of the Contract, the Contractor will receive up to six sets of the reduced Plans <br /> (11" x 17") and accompanying Special Provisions. In addition, the City will supply up to three <br /> sets of full-size plans (22" x 34"). All Plans and Special Provisions will be conformed with <br /> addenda unless Contractor requests otherwise. <br /> Additional Plans and Special Provisions may be purchased by payment of the current printing <br /> costs. I <br /> 1-02.4 Examination of Plans, Specifications, and Site of Work <br /> 1-02.4(1) General <br /> 111 <br /> Delete the fifth paragraph of 1-02.4(1), beginning with "Bid prices shall reflect", and <br /> substitute the following: <br /> Bid prices shall include everything necessary for the completion of the Work including, <br /> but not limited to, providing the materials, equipment, tools, plant and other facilities, <br /> and the management, superintendence, labor, and all necessary testing services. <br /> Revise the first sentence in the paragraph that begins with"Any prospective Bidder desiring I <br /> an explanation" to read as follows: <br /> Any prospective Bidder desiring an explanation or interpretation of the Bid Documents, <br /> shall request the explanation or interpretation in writing by close of business three <br /> business days preceding the bid opening to allow a written reply to reach all <br /> prospective Bidders before the submission of their Bids. <br /> Supplement 1-02.4(1) by adding the following: I <br /> Bidder acknowledges that the Bidder has not relied on representation or warranty of <br /> the City not expressly included in the Contract Documents. <br /> The information provided by the City is not intended to be a substitute for, or a <br /> supplement to, the independent verification by the Bidder to the extent such <br /> independent investigation of the Drawings and Specifications or Site conditions is <br /> deemed necessary or desirable by the Bidder. Bidder acknowledges that they have <br /> not relied upon City or Engineer furnished information regarding site conditions in <br /> preparing and submitting a Bid. <br /> POE Combined Sewer Main Imp. Division 1 —GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-8 I <br />