Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, <br /> and Addenda <br /> Revise the first and second paragraphs of 1-04.2 to read as follows: I <br /> The complete Contract includes Division C-CONTRACT, Division P - PROPOSAL, Division <br /> B- BID ITEM DESCRIPTIONS, Special Provisions, Contract Plans, Standard Specifications, <br /> Standard Plans in effect as of the date Bids are opened, Addenda, supplemental agreements, <br /> change orders, certifications and affidavits required by this Contract and by law, and Federal <br /> requirements that apply to this Contract and Project. These parts complement each other in <br /> describing a complete Work. Any requirement in one part binds as if stated in all parts. The <br /> Contractor shall provide any Work or materials clearly implied in the Contract even if the <br /> Contract does not mention it specifically. I <br /> Any inconsistency in the parts of the Contract shall be resolved by following this order of <br /> precedence: <br /> 1. Change Orders, <br /> 2. Addenda, <br /> 3. Division C-CONTRACT, <br /> 4. Division P - PROPOSAL, <br /> 5. Division B- BID ITEM DESCRIPTIONS I <br /> 6. Special Provisions, <br /> 7. Contract Plans, <br /> 8. City's Standard Drawings (if any) <br /> 9. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal <br /> Construction, <br /> 10. WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br /> Revise the seventh paragraph of 1.04.2 to read as follows: <br /> In case of any ambiguity or dispute over interpreting the Contract, the Engineer's decision will be <br /> final as provided in 1-05.1 AUTHORITY OF THE ENGINEER <br /> 1-04.3 Reference Information 111 <br /> Revise 1-04.3 to read as follows: <br /> Reference Information provided to the Contractor is not part of the Contract. The City of I <br /> Everett does not guarantee the accuracy of the Reference Information and is not <br /> responsible for the content of the Reference Information in any manner. Any use of <br /> Reference Information by the Contractor is done solely at the Contractor's risk. I <br /> ***This project is located within the Port of Everett Norton Terminal Development& MTCA <br /> 3'73 Interim Action Project Site (POE-NT Site). Select Reports, plan sheets, and passages <br /> from the POE-NT 3rd Interim Action Project are included for ease of reference only. The <br /> reference material provided is not to be considered all-inclusive and the Contractor is solely <br /> responsible for obtaining, reviewing and following State, Federal, Port of Everett, and local <br /> requirements associated with Work within the POE-NT site.*** <br /> POE Combined Sewer Main Imp. Division 1 -GENERAL REQUIREMENTS October 2021 <br /> Work Order#UP3768 SP 1-18 <br />